background image

H B X   E C O - 0 6 0 0   G e o t h e r m a l   C o n t r o l

V e r s i o n   1 . 0 . 0

 Page 3

 131

mm

5.157” 

 

248

mm

9.764” 

  66

mm

2.598” 

 3.937” 

99.9

mm

 

222

mm

8.740” 

RELAYS

240VAC 5A Max

 

INPUT

120VAC 15A Max

ZON-0600

ZONE CONTROLLER

ECO-0600

GEOTHERMAL CONTROL

 

65.96

mm

2.597” 

Specifications:

4 x thermistor Input (10k Ohm)

4 x Stage Relays 24VAC 2A Max

3 x AUX Relays

•  120VAC 1/6hp FLA or LRA 5A Max (Pump)

•  240VAC 1/2hp FLA or LRA 5A Max (Pump)

•  120VAC/240VAC 5A Max (Other)

1x Input /- 10% 50/60Hz 250mA Max

Combined relay power should not exceed 15A

Weight:

0.408Kg     

Dimensions: 

     

121mm W x 188mm H x 66mm

4.76in W x 7.40in H x 2.60in

  

ETL Listings:                                                              

 

Meets CSA C22.2 No. 24 

 

 

 

 

Meets UL Standard 873 

 

 

 

ETL Control No. 3068143 

Storage:       

50°F to 104°F (10ºC to 40ºC)

ECO-0600

WiFi: 2.4GHz Network Only

FCC ID: 2AHMRESP125

TECHNICAL DATA AND DIMENSIONS

TECHNICAL DATA AND DIMENSIONS

ECO-0600 TECHNICAL DATA

DIMENSIONS

 

RELAYS

240VAC 5A Max

 

INPUT

120VAC 15A Max

ECO-0600

ZONE CONTROLLER

ECO-0600

GEOTHERMAL CONTROL

Содержание ECO-0600

Страница 1: ...HBX Control Systems Inc Installation Manual ECO 0600 Version 1 0 0 ECO 0600 Geothermal Control...

Страница 2: ...0 0 0 Table of Contents TABLE OF CONTENTS Introduction 1 3 Description 1 Safety Symbols Warnings 2 Receipt Inspection 2 Technical Data and Dimensions 3 Wiring Installation 4 25 Wiring 4 Installation...

Страница 3: ...applications with separate hot and cold tanks This control can also function as a stand alone system without WiFi capabilities FEATURES App for Android or Apple Smartphone tablet device for remote ac...

Страница 4: ...ca gov WARNING a Use copper conductors only if the terminal is acceptable only for connections to copper wire b Use aluminum conductors only or use aluminum or copper clad aluminum condctors only if...

Страница 5: ...VAC 1 2hp FLA or LRA 5A Max Pump 120VAC 240VAC 5A Max Other 1x Input 120VAC 10 50 60Hz 250mA Max Combined relay power should not exceed 15A Weight 0 408Kg Dimensions 121mm W x 188mm H x 66mm 4 76in W...

Страница 6: ...ev Valve Output Auxiliary Output 2 Auxiliary Output 1 DO NOT CONNECT POWER HERE GR POWER 120 17 N L 16 15 5A 1 Aux 1 9 10 1 2 Aux 2 11 12 2 5A HBX ECO 0600 GEOTHERMAL CONTROL 1 8 7 2 HD 3 10 9 4 CD De...

Страница 7: ...e heat pump will light up in respect to their classification REV VALVE When a cooling demand is activated the Rev Valve will light up to indicated it is on PUMPS When a pump is activated by a call you...

Страница 8: ...STATUS Sync Code Sync Code of the ECO 0600 Wi Fi Network displays current SSID network connected to Wi Fi Password displays password of current network connected to Wi Fi Strength displays Signal str...

Страница 9: ...l be set for the minimum OFF lagtime between heat pump stages Rotate Time Rotate Time The time of rotation between heat pumps This setting is in hours of run time This means that the heat pumps are go...

Страница 10: ...you are not using outdoor reset With this option enabled the Tank Temperature setting will be replaced by Min Tank and Max Tank Temperature settings OFF 40 F to 127 F Default OFF Differential Set this...

Страница 11: ...you are not using outdoor reset With this option enabled the Tank Temperature setting will be replaced by Min Tank and Max Tank Temperature settings OFF 0 F to 119 F Default OFF Differential Set this...

Страница 12: ...is is the differential for the DHW tank Set this parameter to the desired differential for the DHW tank 2 F to 100 F Default 8 F Differential DHW Target Use DHW Tank WWSD CWSD TIME This setting is use...

Страница 13: ...or on its own to bring the backup on This setting is used to set a differential on the tank at which you would like the backup to come on This setting will override the backup temperature and backup t...

Страница 14: ...2 Start Delay the amount of time if necessary for Pump 1 be delayed to run after the call associated with it has been activated Allowed Values 0 240 Seconds Pump Exercise Time the amount of time if n...

Страница 15: ...tize a heating demand over a cooling demand Cooling The control will prioritize a cooling demand over a heating demand Auto The control will automatically set the priority based off how close the outd...

Страница 16: ...Scan Pressing this will allow the ECO 0600 to actively scan for all available networks that you can choose from and then you may select the 2 4 GHz network that you wish to connect to Wi Fi SSID Manu...

Страница 17: ...manent cool demand This can be used instead of attaching a thermostat OFF ON Default OFF RUN TIMES This setting will allow you to view your heat pump S and or backup boiler run times Reset Run Times S...

Страница 18: ...Fri Sat Sun Time Zone Select the time zone for your area STANDARD TIMEZONES DAYLIGHT SAVINGS Atlantic Standard Time AST GMT 4 Eastern Standard Time EST GMT 5 Central Standard Time CST GMT 6 Mountain...

Страница 19: ...r Inputs 1 MOD 1 2 1 1 2 4 3 2 3 6 5 3 Mod Staging Output MOD 2 MOD 3 4 STG 4 7 8 4 3 5 6 3 2 3 4 2 1 1 2 1 Staging Output STG 3 STG 2 STG 1 5A 3 Rev Valve 13 14 3 ECO 0600 Input Power DO NOT CONNECT...

Страница 20: ...or Inputs 1 MOD 1 2 1 1 2 4 3 2 3 6 5 3 Mod Staging Output MOD 2 MOD 3 4 STG 4 7 8 4 3 5 6 3 2 3 4 2 1 1 2 1 Staging Output STG 3 STG 2 STG 1 5A 3 Rev Valve 13 14 3 ECO 0600 Input Power DO NOT CONNECT...

Страница 21: ...2 1 1 2 4 3 2 3 6 5 3 Mod Staging Output MOD 2 MOD 3 4 STG 4 7 8 4 3 5 6 3 2 3 4 2 1 1 2 1 Staging Output STG 3 STG 2 STG 1 5A 3 Rev Valve 13 14 3 ECO 0600 Input Power DO NOT CONNECT HERE DO NOT CONN...

Страница 22: ...s 1 MOD 1 2 1 1 2 4 3 2 3 6 5 3 Mod Staging Output MOD 2 MOD 3 4 STG 4 7 8 4 3 5 6 3 2 3 4 2 1 1 2 1 Staging Output STG 3 STG 2 STG 1 5A 3 Rev Valve 13 14 3 ECO 0600 Input Power DO NOT CONNECT HERE DO...

Страница 23: ...differential settings Check heat pump lag time Backup boilers not coming on Check wiring Check backup settings Ensure one backup setting is not set to off Backup boiler taking too long to come on Che...

Страница 24: ...is not turning on Control is CWSD No cool demand No power Check wiring on pins 15 16 17 Can t connect to Wi Fi Verify SSID and password Must connect to the 2 4 GHz network Ensure port 1314 is open Ch...

Страница 25: ...sers sole remedy shall be at HBX s option repair or replacement The foregoing warranties and remedies are exclusive and in lieu of all other warranties expressed or implied either in fact or by operat...

Страница 26: ...H B X E C O 0 6 0 0 G e o t h e r m a l C o n t r o l V e r s i o n 1 0 0 Page 24 NOTES...

Страница 27: ...H B X E C O 0 6 0 0 G e o t h e r m a l C o n t r o l V e r s i o n 1 0 0 Page 25 NOTES...

Страница 28: ...ems Inc 2021 Toll Free Technical Support 1 855 410 2341 Phone 1 403 720 0029 Fax 1 403 720 0054 Email info hbxcontrols com Web www hbxcontrols com HBX Control Systems Inc 4516 112th Avenue SE Calgary...

Отзывы: