23
©HBS Bolzenschweiss-Systeme GmbH & Co. KG
All rights reserved – Reprinting, in whole or in part, only with the approval of the manufacturer
10 Preparing the Fully Automatic Stud Feeder (VBZ)
10.3 Inspection Tasks Prior to Commissioning
Prior to every commissioning, ensure that
the hose couplings are screwed to the stop block on the feed hose,
the hose couplings are securely screwed at the feed tube and at the separa-
tor cover,
the feed tube is locked in the welding head,
the separator cover is securely screwed to the separator cage with the two
knurled cap screws,
the feed hose has been inspected for impermissible wear,
the feed hose is not operated under mechanical stress.
Your VBZ is now ready for commissioning.
Содержание VBZ-3
Страница 39: ......