
©HBS Bolzenschweiss-Systeme GmbH & Co. KG
All rights reserved – Reprinting, in whole or in part, only with the approval of the manufacturer
22
10 Preparing the Fully Automatic Stud Feeder (VBZ)
Insert the changeover slide
(pos. 18)
into the separator cage
(pos. 9)
.
Caution!
The groove machined into the slide
(pos. 18)
must be plugged into the carri-
er in the separator cage
(pos. 9)
!
Place the changeover parts
(pos. 12)
in the outlet and tighten the two screws
(pos. 13)
.
Now place the changeover cover
(pos. 16)
with feed hose
(pos. 15)
on the sepa-
rator cage
(pos. 9)
.
Caution!
The blind hole in the cover
(pos. 16)
must engage with the cylindrical pin on
the separator cage
(pos. 9)
and the no. 20 o-ring must be in the recess of
the separator cage.
Tighten the two knurled cap screws
(pos. 17)
.
Now fill your studs in the feeding bowl (
pos. 10
).
Содержание VBZ-3
Страница 39: ......