www.haze
base
.com
4
English
2.2 Working with CO
2
The handling with CO
2
carbon dioxide as well as the connection and commissioning is necessarily carried out
by trained technical personnel .
Is the carbon dioxide concentration in the room is too high , threatening suffocation . The maximum allowable
workplace concentration is 5000 ml / m3 MAK value . Please observe the regulations for handling carbon
dioxide could be different in other the country.
The hose supplied is designed 1 1/4“ right - male - threaded for connection to a W x 21.8 . If the CO
2
bottle
have a different threaded connection , so an appropriate adapter must be used.
3. Commissioning of base•low•pro
3.3 Connection diagram of the CO
2
bottles
If you need fittings for your CO
2
bottle, see chapter 11 for more information about accessories.
3.1 Selecting of the location
The location in which the base•low•pro is to be operated must be dry:
• free from dusty or polluted air
•
free from vibrations
• located on an non-flammable place or surface
• Well-ventilated with fog-free air keeping the ambient operating temperature between 5°C and 45°C and
the relative air humidity below 80%
Connection of one CO
2
bottle
Connection of serval CO
2
bottle
1
2
2
1
3
4
3
1) CO
2
hose 1.5m
2) Inline Filter
3) CO
2
bottle connection Europe
1) CO
2
hose 1.5m
2) CO
2
T-fitting
3) Inline Filter
4) CO
2
bottle connection Europe