
USE ONLY HAYWARD GENUINE REPLACEMENT PARTS
5
Front Panel Removal
DANGER of Death, Injury or Property Damage if procedure not followed.
Dead front removal
is required for this installation. Power to the AquaRite S3 panel MUST be shut off before the dead
front is removed. This means a complete shutdown of power to the entire AquaRite S3 panel.
Installation Steps
Details on each installation step are presented on the following pages:
1. Mounting the equipment (page 7)
AquaRite S3 main unit
Optional Temperature sensors
2. Plumbing (page 8)
TurboCell
Flow Switch
3. Electrical Wiring (page 9)
High Voltage
Low voltage wiring (Smart Relay, VSP, heater, sensors, heater, flow switch and TurboCell)
4. Prepare the pool water (page 17)
General Water Chemistry
Salt
5. System Startup (page 19)
Configuration
Operation
Remove
three screws
Pull the display away from
the panel by grasping it
with your hand (no tools
required). Then, remove
the 3 screws and pull the
plastic panel away from
the enclosure. It is not
necessary to disconnect
the display wiring.