05/21
MODEL H1011.8HO/H1011.8HO2
PAGE 4 OF 10
INSTALLATION PROCEDURE…
STEP 4:
Remove 1-
1/2” IPS outlet elbow from traps (not supplied). Install elbow inside frame
onto waste stub-outs.
Reassemble trap “U” bends with inlets centered behind
fountains.
STEP 5:
Remove slip joint nuts from bottom of fountain waste outlet. Assemble nut over 1-
1/4” O.D. end of waste elbow as supplied by Haws. Assemble waste elbow onto
bowl waste body using seal washer provided and tighten nut hand tight. Measure
vertical distance down to trap inlet and cut the vertical (not supplied) elbow to length
allowing 1/2" minimum for engagement into trap. Mark and similarly cut to length the
horizontal waste elbow. Install elbow and tighten all the slip joint nuts.
STEP 6:
See Figure 1 (below) for detail section view of side screw grille attachment. Unpack
grille and insert upper lip behind bottom of back panel, align sides and hold up flush
to bottom of back panel. Hold grille against wall and mark centers of grille side slots
on wall. Masking tape may be used to prevent finished wall damage from mark.
Install the “s” clips in mounting frame using #10 sheet metal screws into pre-drilled
holes on lower end of each side of frame. Tighten #10 screw w
hile holding “s” clips
centered on wall marks. Check grille fit by installing grille and partially tightening #6-
23 socket head screws through side of grille. Ensure proper panel and grille
alignment, then tighten eight 5/16-18x1 hex head screws.
STEP 7:
Unpack and remove chiller from carton. Remove front panel screws and panel. Do
not remove insulating putty and foam from copper tubes or Styrofoam insulation from
evaporator coil. Remove any inner packing, which may be around compressor. If
applicable, remove junction box cover and electrical knock out on lower right side of
housing. Install fittings (supplied) on chiller inlet and outlet tubes (see Installation
Drawing).
FIGURE 1
# 10 SHEET
METAL SCREW
“S” CLIP
MOUNTING
FRAME
STUD
# 6 SCREW
FINISHED
WALL
GRILLE
CLIP NUT