background image

03/20 

Model H1001.8/H1001.8HPS 

Page 3 of 7 

 

 

 

 

INSTALLATION PROCEDURE 

 

GENERAL NOTES: 

 

The Model H1001.8/H1001.8HPS Water Cooler assembly requires installation of the mounting 
frame as described in Steps 1 - 2, then mounting the fountain bowl assembly as described in 
Steps 3 - 6, and finally completing chiller water and electrical connections and starting chiller per 
Steps 7 - 11. First check that all required parts are received. 

 

Grounding may cause electrical feedback into the electric drinking fountain causing an 
electrolysis, which creates a metallic taste or an increase in the metal content of the 
water. This condition can be avoided by using dielectric couplings in the assembly. The 
waste line, which is supplied by the installer, should also have a dielectric (plastic) 
coupling to completely isolate the assembly from the building plumbing system. 

 

NOTES: 

1.  For all plastic push-in type fitting connections, only connect NSF-61 copper or 

plastic tubing.  Stainless steel or glass tubing is not recommended.  The 
following assembly instructions must be followed to ensure a watertight 
connection: 

a.  Cut tubing square and clean. 
b.  Mark from end of tube the length of insertion (See table below). 
c.  Push tube into the fitting until it bottoms out. 
d.  To remove, depress collet and pull tubing out. 

Tube Sizes 

O.D. 

Tolerance 

Insertion Depth 

1/4” 

±.005” 

11/16” 

3/8” 

±.005” 

3/4” 

1/2” 

±.005” 

7/8” 

 

STEP 1: 

Provide wall opening as detailed in Installation Drawing.  Frame must be positioned 
such that frame flanges overlap and butt against finished wall surface.  Mounting 
holes are provided for #6 sheet metal screws.  After frame is positioned in wall, 
swing chiller support tray into position (See Installation Drawing), align tray holes 
with holes in frame and fasten with #10 sheet metal screws.  Mounted frame must 
support 50 pound chiller in addition to fountain weight and user generated forces.

 

 

STEP 2: 

Install waste, supply and electrical lines in locations shown in Installation Drawing.  
Waste and supply lines may be installed for either rear or side entry. Verify proper 
waste, supply, electrical and frame locations. Use level to verify horizontal and 
vertical frame mounting to insure proper bowl drainage. 

 

STEP 3: 

Installation Drawing shows fountain bowl, back panel and grille locations. Unpack 
bowl and remove bottom plate using 3/32” hex allen wrench. Install back panel on 
frame with narrower edge to bottom. Position nut retainers into mounting frame and 
use two 5/16-18x1 hex head screws partially started in outside holes to support 
panel.  Install bowl/bracket assembly onto panel using four 5/16-18x1 hex head 
screws hand tightened.  See sheet 2 of Installation Drawing for appropriate bowl 
mounting pattern to use for this model 

 

STEP 4: 

Remove 1-

1/2” IPS outlet elbow from trap (not supplied). Install elbow inside frame 

onto waste stub-

outs. Reassemble trap “U” bend with inlets centered behind 

fountains.  

 

Содержание H1001.8

Страница 1: ...made by the owner or his agents except upon written authority from HAWS Sparks Nevada HAWS will not be liable for any damages caused by defective materials or poor workmanship except for replacements as provided above Buyer agrees that HAWS shall not be liable for general special or consequential damages claimed to arise under the contract of sale The drinking fountain manufactured by HAWS is warr...

Страница 2: ...ATM flowing pressure Where sediment or mineral content is a problem an inlet filter is recommended PLUMBING CONNECTIONS Inlet is 3 8 O D tube Waste outlet is 1 1 4 O D tube ELECTRICAL CONNECTIONS 115VAC 60HZ 4 7 AMPS Chiller wired direct to incoming line by others PARTS LIST MODEL PACKAGE QUANTITY ITEMS INCLUDED MTGFR SM 1 Mounting Frame Required Sold Separately 3 10 Sheet Metal Screws HCR8 1 Chil...

Страница 3: ...11 16 3 8 005 3 4 1 2 005 7 8 STEP 1 Provide wall opening as detailed in Installation Drawing Frame must be positioned such that frame flanges overlap and butt against finished wall surface Mounting holes are provided for 6 sheet metal screws After frame is positioned in wall swing chiller support tray into position See Installation Drawing align tray holes with holes in frame and fasten with 10 s...

Страница 4: ...all fittings supplied on chiller inlet and outlet tubes See Installation Drawing STEP 8 Thoroughly flush supply line to remove all foreign matter Connect 1 2 IPS supply screwdriver stop not supplied to stub out in wall Place chiller on chiller support tray against right hand side fully to rear with condenser open panel side facing to front Install supply 3 8 O D tubing not supplied between screwdr...

Страница 5: ...trol After adjustment allow unit to cycle off before checking outlet water temperature TROUBLESHOOTING PROBLEM REPAIR CHECKLIST 1 Insufficient bubbler flow 1a Check that inlet screwdriver stop valve is in wide open position b Verify minimum 30 psi flowing supply pressure c Clean strainer See 5874 Series Valve Manual d Adjust valve to increase flow Use front adjust screw or see 5874 Series Valve Ma...

Страница 6: ...s Corporation All Rights Reserved HAWS and other trademarks used in these materials are the exclusive property of Haws Corporation C R MODEL S 1455 KLEPPE LANE SPARKS NEVADA 89431 775 359 4712 FAX 775 359 7424 E MAIL HAWS HAWSCO COM WEBSITE WWW HAWSCO COM THIS DOCUMENT IS TRUE AND CORRECT AT TIME OF PUBLICATION CONTINUED PRODUCT IMPROVEMENTS MAKE SPECIFICATIONS AND MEASUREMENTS SUBJECT TO CHANGE W...

Страница 7: ...NTENANCE MANUAL FOR PUSH BUTTON AND VALVE INSTALLATION MAINTENANCE INSTRUCTIONS 5 REFER TO MTGFR SM INSTALLATION DRAWING FOR ROUGH IN DIMENSIONS 6 INSERT 5 16 18 PANEL INSERTS FROM OPPOSITE SIDE AT LOCATIONS SHOWN BY DARKENED HOLES 7 FOUNTAIN REMOVAL FIRST REMOVE SCREWS AND THEN SQUEEZE CLIPS ON NUT RETAINER TO POP OUT INSTALL IS REVERSE OF REMOVAL 8 ALIGN HOLES IN CHILLER SUPPORT TRAY WITH HOLES ...

Отзывы: