4
016-0171-655 Rev. E
23
NOZZLE CONTROL VALVE INSTALLATION
BUMPER INSTALLATION FOR C-SERIES MACHINES WITH PROSTOP-E VALVES AND WILGER NOZZLE BODIES
1. Locate the boom stops and remove the existing hardware. Keep the existing washers and nuts.
FIGURE 8. Boom Stop
2. Place two boom stop spacers (P/N 107-0172-609) behind the boom stop.
FIGURE 9. Installed Boom Spacers
3. Use the longer bolt provided in the kit (P/N 311-0070-014) and the original nuts and washers to secure the
boom stop and spacers.
Содержание RG1300
Страница 8: ...CHAPTER 1 4 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Страница 20: ...CHAPTER 2 16 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Страница 22: ...CHAPTER 3 18 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Страница 32: ...CHAPTER 4 28 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Страница 38: ...CHAPTER 5 34 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Страница 43: ...016 0171 655 Rev E 39 CHASSIS CABLE INSTALLATION SYSTEM DIAGRAMS...
Страница 50: ...APPENDIX A 46 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Страница 54: ...APPENDIX B 50 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...
Страница 58: ...Index 54 Hawkeye Installation Manual for RoGator C Series RG900 RG1100 RG1300...