
(6) "Main unit" installation
1. Installation position should be below the instrument desk.
2. Connect the cable according to the wiring diagram.
3. Connect the main unit and all wiring harness connector.
4. After confirmed, will harness tied neatly.
5. The host should avoid oil leakage and water leak position to installation,
outlet is down, avoid water seepage destroy circuit board.
(7) "Central lock" installation
1. If the car is equipped with electric central door lock, as long as discriminant
is positive triggered or negative trigger, reference to central lock wiring
principle diagram;
2. The car is equipped with electric central control door lock, but no actuator in
driving seat side door (the other three door all have actuator ), as long as
install a actuator in driving seat side door , please reference to central lock
connection diagram , and make the central lock programming work time is
0.5 seconds (Factory default ).
3. The original car door lock without actuator , should be install with a set of
central lock motor, please reference to central lock wiring diagram
.Programming and central lock work time is 0.5 seconds (Factory default ).
4. The car is equipped with pneumatic central control door lock; please
reference to central lock wiring diagram (figure 5).Programming central lock
work time of 3.5 seconds.
(8) "Start test" connection
Purple is used to identify the engine start line is in the starting conditions.
When the host Built-in sensors cannot meet the requirement of the engine start
detection, can be Programmed to function is set to start line identification; Rev
Test line can pick up the lamp, Generators, tachometer, or on the surface of
high voltage ignition line around five laps.
HA-FM11 manualv3_p21-40_Layout 1 15/08/2016 18:51 Page 15
Содержание HA-FM11
Страница 2: ...HA FM11 manualv3_p1 20_Layout 1 15 08 2016 19 46 Page 2 ...
Страница 20: ...The installation diagram HA FM11 manualv3_p1 20_Layout 1 15 08 2016 18 42 Page 18 ...
Страница 21: ...HA FM11 manualv3_p1 20_Layout 1 15 08 2016 18 42 Page 19 ...
Страница 33: ...Chapter 12 Trouble shooting HA FM11 manualv3_p21 40_Layout 1 15 08 2016 18 51 Page 13 ...
Страница 36: ...HA FM11 manualv3_p21 40_Layout 1 15 08 2016 18 51 Page 16 ...
Страница 37: ...HA FM11 manualv3_p21 40_Layout 1 15 08 2016 18 52 Page 17 ...
Страница 38: ...HA FM11 manualv3_p21 40_Layout 1 15 08 2016 18 52 Page 18 ...
Страница 39: ...HA FM11 manualv3_p21 40_Layout 1 15 08 2016 18 53 Page 19 ...