www.havis.com • 1-800-524-9900
6
7
Cable Management
1)
Tip the Docking Station to a position that is comfortable to work with.
2)
Connect all cables that are necessary for computing needs.
3)
Use Zip Ties (Hardware Kit Item 1) and/or Zip Tie Mounts (Hardware Kit Item 6)
to strain relieve cables. Strain Relief Points are located above each port and on
the bottom of Docking Station and should be used to anchor each cable.
4)
Create a service loop with cables to ensure that no tension is on the
connectors and to enable intended motion.
5)
Tie off cables onto a stationary part of the mounting system.
Installation
1)
Align Docking Station mounting holes with the holes on VESA 75mm
hole pattern device. Using the four (4) M4 0.7x12mm Pan Head Screws
(Hardware Kit Item 3), eight (8) Washers, M4 (Hardware Kit Item 4), and four (4)
Lock Washers, M4 (Hardware Kit Item 5), secure the Docking Station to device.
Torque screws to 20 in-lbs (2.3Nm) ± 10%.
A)
Havis Desktop Stand installation
(sold seperately, Part # DS-DA-218).
B)
In-Vehicle mounting system installation.
M4 x 0.7x12mm
Pan Head Screws
Zip Tie
Mount
Collect cables and secure
to the mounting system.
(Note: Mounting system not included)
This loop must be large enough
to allow full range of expected
rotation and extension without
stressing connections.
M4 x 0.7x12mm
Pan Head Screws
Lock Washer, M4
Washer, M4
Washer, M4
Desktop Stand
(VESA 75 mm)
ENSURE (4) WASHERS ARE INSTALLED BETWEEN
MOUNTING EQUIPMENT AND DOCKING STATION
M4 x 0.7x12mm
Pan Head Screws
Lock Washer, M4
Washer, M4
Washer, M4
ENSURE (4) WASHERS ARE INSTALLED BETWEEN
MOUNTING EQUIPMENT AND DOCKING STATION