4) Lower the Docking Station to the Mounting Bracket as shown and secure with (4) 1/4” -20 x 3/8”
long screws (Hardware Kit Item 4). Ensure cable bundle remains in Cable Channel before securing.
Torque screws to 80-in (9.0 Nm) ± 10%.
5) Attach the Laptop Screen Security (Part # DS-DA-236) to Docking Station using the supplied hardware
and installation instructions.
6) Secure cable bundle to the Mounting Bracket with a supplied Zip Tie.
7) Create a service loop with cable bundle to ensure that no tension is on the connectors and to enable
intended range of motion.
8) Tie off cables onto a stationary part of the mounting system.
(Mounting system not included with Docking Station)
Installation & Cable Management
(continued)
Collect cables to secure to the
mounting system.
(Note: mounting system not included)
5
1/4” – 20 x /8” Screws
8
6
7
This loop must be large enough to allow
full range of expected rotation and
extension without stressing connections.