2) Orient
the Docking Station in a position that is comfortable to work with.
3) Install
all cables that are necessary for computing needs. Use Zip Ties (Hardware Kit Item 1) to strain
relieve cables to the Strain Relief Points, routing all cables together through the Cable Channel and out
the rear of the Docking Station.
1) Remove the Mounting Bracket from the packaging. Install the Mounting Bracket to the Motion Device
using (4) 1/4“-20 x 5/8” long screws (Hardware Kit Item 3). Torque screws to 80 in-lbs (9.0Nm) ± 10%.
NOTE: Numerous hole patterns present in Mounting Bracket will accommodate Havis Motion Devices
as well as most competitors’.
1/4” – 20 x 5/8” Screws
Mounting Bracket
Typical Motion Device Example
(not included)
Cable Channel
Installation & Cable Management
NOTE: We recommend applying a drop of medium strength (blue) thread locking adhesive to the threads of all fasteners.
NOTE: Nous recommandons d'appliquer une goutte d’adhésif de blocage de force moyenne (bleu) sur les fils de toutes les fixations
.