EN
EN
PH-21
17
ASSEMBLING PROCESS
2. ASSEMBLING PROCESS
1
Step 1: Screw the bottom tube onto the base.
2
Step 2: Screw the middle tube with the bottom tube.
3
Step 3: Feed the Power Cord through the Base and the Bottom Tube, middle
tube ,and pull through around 2m of cable.
Fig. 1
Fig. 2
Fig. 3
Fig. 4