19
Installation/Operation & Maintenance Manual
HFL4140E 4-POST ALIGNMENT LIFT
5.2 ROLLING JACK OPERATION
Turn the 3-way control valve on the power pack to
the left. Other lifting and lowering operations are the
same to the main machine.
Chapter 6 MAINTENANCE
IIMPORTANT
For a longer life of the platforms preserving their
good state it is compulsory to carry out the following
maintenance:
■
Prevent or repair scratches that cut the coat of
paint
■
Immediately clean possible drops of acid or
corrosive oils
■
Constantly wipe them dry from water, especially
during the winter, because water contains salt
WARNING
Maintenance operations must be performed
EXCLUSIVELY BY EXPERT PERSONNEL WITH A
COMPLETE WORKING KNOWLEDGE OF THE
LIFT.
When servicing the lift use all necessary or useful
precautions to
PREVENT
ACCIDENTAL
STARTING OF THE UNIT
:
The power supply must be cut off.
Remember:
■
MAIN POSSIBLE POTENTIAL HAZARDS
■
SAFETY INSTRUCTIONS IN CHAPTER 3
“SAFETY”.
■
RISK OF ELECTRIC SHOCK on the machine
supply terminal box.
DO NOT ATTEMPT TO ADJUST OR LUBRICATE
PARTS OF THE LIFT WHILE THEY ARE IN
MOTION.
AFTER EACH MAINTENANCE INTERVENTION
REMEMBER TO REFIT THE GUARDS AND REFIT
OR REACTIVATE GUARDS AND PROTECTIONS
THAT WERE REMOVED OR DISABLED TO
MAKE THE MAINTENANCE WORK EASIER.
IMPORTANT
For optimal maintenance of the lift:
■
Use only original spare parts and the right tools
for the job; make sure the tools are in good
condition.
■
Observe the maintenance intervals
recommended in the manual; these times are
Содержание HFL4140E
Страница 2: ......
Страница 4: ......
Страница 30: ...24 Installation Operation Maintenance Manual HFL4140E 4 POST ALIGNMENT LIFT APPENDIX B HYDRAULIC DIAGRAM...
Страница 39: ......
Страница 40: ......