
5. CONNECT WIRING
&WARNING
Risk of electrical shock. Electrical wiring must be done by qualified personnel in accordance with all applicable
codes and standards. Before connecting wires, switch power off at service panel and lock service disconnecting
means to prevent power from being switched on accidentally.
1. Connect cable to range hood wiring using included wire connectors. Connect BLACK to
BLACK, WHITE to WHITE and GREEN or BARE wire to GREEN wire.
2.
Reinstall wiring box cover using both screws previously removed in step
3.1.
3.
Reinstall bottom panel using the 7 screws previously removed in step
3.1.
Make sure
both grease guides are aligned with the holes.
4.
Using long nose pliers, pull out the end of each grease guides
(8).
Then set them in
such a way their flange slightly protrudes above the bottom panel surface
(C).
5. Slide the main grease cup back in.
HAUSLANE
267 Wattis Way, South San Francisco, CA 94080
Tel: 1-800-929-0168 Email: [email protected]
7
Содержание Chef Series
Страница 1: ...INSTRUCTION USE CARE MANUAL UC C400SS 30 ...
Страница 12: ...HAUSLANE 267 Wattis Way South San Francisco CA94080 Tel 1 800 929 0168 Email info hauslane com 11 ...
Страница 13: ...HAUSLANE 267 Wattis Way South San Francisco CA94080 Tel 1 800 929 0168 Email info hauslane com 12 ...
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 18: ......
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ......