42
4000414930
E 10.15
USA / GB
STAR 8 - STAR 22J - STAR 10 - STAR 26J
D
- Inspection and maintenance schedule
4 - Periodic inspection
The Periodic inspection is a thorough inspection of the operation and safety features of the machine. This
inspection must be done before the sale/resale of the machine and at a frequency of 125 hours or once a year,
according to the regulations. Local regulations may have specific requirements on frequency, and content of
inspections.
Otherwise or in addition, use the detailed program below.
This inspection is the responsibility of the owner, and must be conducted by a qualified technician.
To ensure safe use and improve the life of machine, HAULOTTE® recommends performing this inspection at
every 125 hours intervals.
Perform this inspection in addition to the daily inspection checks.
Intervention to be made after :
• Extensive dismantling and reassembly.
• Repairs involving the machine's essential components.
• Any accident causing stress to the machine.
1 - Increase in periodic inspections
2 - For countries where machines are not subject to controlled periodic maintenance
Symbol
Description
Symbol
Description
Visual inspections
Systematic replacement
Operation requiring HAULOTTE
Services® authorisation
Check-Test See user manual or
machine maintenance book
(1)
Visual inspection with dismantling
to exchange/replace if necessary
Operation requiring HAULOTTE
Services® authorisation
Increase in periodic inspections
Check level
Tightening (bolt, etc.)
Lubrication
Tolerance (clearance)
Oil change
(2)
Static and dynamic tests
For countries where machines are
not subject to controlled periodic
maintenance
Содержание STAR 10
Страница 2: ...2 4000414930 E 10 15 USA GB STAR 8 STAR 22J STAR 10 STAR 26J ...
Страница 10: ...10 4000414930 E 10 15 USA GB STAR 8 STAR 22J STAR 10 STAR 26J A Preface Foreword Notes ...
Страница 18: ...18 4000414930 E 10 15 USA GB STAR 8 STAR 22J STAR 10 STAR 26J B Safety Notes ...
Страница 19: ...19 4000414930 E 10 15 USA GB STAR 8 STAR 22J STAR 10 STAR 26J C Familiarization Notes Familiarization ...
Страница 32: ...32 4000414930 E 10 15 USA GB STAR 8 STAR 22J STAR 10 STAR 26J C Familiarization Notes ...
Страница 62: ...62 4000414930 E 10 15 USA GB General data Breaking test procedure MS0004 Notes ...
Страница 66: ...66 4000414930 E 10 15 USA GB General data Torque Values MS0005 Notes ...
Страница 72: ...72 4000414930 E 10 15 USA GB Chassis and turntable Slew ring inspection MS0010 Notes ...
Страница 80: ...80 4000414930 E 10 15 USA GB Electric Electrical wiring MS0059 Notes ...
Страница 88: ...88 4000414930 E 10 15 USA GB Chassis and turntable Tires Tyres and pressures Wheel replacement MS0044 Notes ...
Страница 98: ...98 4000414930 E 10 15 USA GB Chassis and turntable Dismantling Reassembling wheels reducer MS0046 Notes ...
Страница 116: ...116 4000414930 E 10 15 USA GB Hydraulics Hydraulic filter cartridge Replacement MS0050 Notes ...
Страница 124: ...124 4000414930 E 10 15 USA GB Electric Battery ies MS0051 Notes ...
Страница 136: ...136 4000414930 E 10 15 USA GB Mast Specific adjustment procedure STAR 8 STAR 20J STAR 10 STAR 26J MS0054 Notes ...
Страница 144: ...144 4000414930 E 10 15 USA GB Mast Inspection of the slack chain sensors MS0062 Notes ...
Страница 148: ...148 4000414930 E 10 15 USA GB Overriding system Overriding function reset MS0085 Notes ...
Страница 159: ...159 4000414930 E 10 15 USA GB STAR 8 STAR 22J STAR 10 STAR 26J E Trouble shooting and diagram 3 Hydraulic diagram P U ...
Страница 160: ...160 4000414930 E 10 15 USA GB STAR 8 STAR 22J STAR 10 STAR 26J E Trouble shooting and diagram Notes ...