122
4001055180
E 06.21
USA / GB
General data
Cylinder inspection
MS0003
4 - Control and maintenance
4.1 -
V
ISUAL
INSPECTIONS
The hydraulic actuating cylinders must be subjected to visual inspections periodic all the 250 hours or 6
months such as defined below :
• Absence of leakage.
• Absence of deformations, visible damage , cracks on the body and fixing of the cylinder.
• Absence of rust and shock on the rod.
• Absence of foreign objects on all surfaces.
• Absence of missing or loosened part (bolt, nut, connection, flexible device, etc).
4.2 -
F
UNCTIONAL
TESTS
To guarantee an optimal level of performance and safety, functional tests must be realized all the 250 hours
or 6 months.
The periodicity can evolve under the following conditions :
• Anomaly noted during visual inspection.
• Abnormal noise during movements of the structure.
• Prolonged storage of the machine ( 6 months).
• Specific storage and use Environment (strong moisture and salinity of the air).
Generic Control :
• Position a load equal to the rated capacity on the cage (or platform).
• Raise the cage (or the platform) using the ground control box. To activate the cylinder to be tested, proceed
as follows :
• Lift Arm hydraulic cylinder : Lift the arm to approximately half full height. The telescopic boom should be fully
extended and in the horizontal position. (For machines fitted with).
• Boom lifting cylinder or Jib cylinder : Lift the concerned equipment (boom or jib) of approximately half way. Extend
the telescope to its maximum.
• Telescoping cylinder : Lift the boom to its maximum angle and telescope approximately 50 cm (19.69 in).
• Measure the distance between the floor of the cage (or of the platform) and the ground.
• Leave the machine in this condition for 15 mn (minutes).
• Measure the distance between the floor of the cage (or of the platform) and the ground.
• If the difference between two measurements does not exceed 4 cm (1.575 in) : the test validates correct operation.
• If the difference between two measurements exceeds 4 cm (1.575 in), contact HAULOTTE Services® or carry out
the additional tests described below.
Содержание HA26 RTJ PRO SW
Страница 8: ...8 Maintenance Book ...
Страница 120: ...120 4001055180 E 06 21 USA GB General data Pins and bearing inspection MS0002 Notes ...
Страница 132: ...132 4001055180 E 06 21 USA GB General data Torque Values MS0005 Notes ...
Страница 148: ...148 4001055180 E 06 21 USA GB Chassis Remove re install the hydraulic motor MS0119 Notes ...
Страница 168: ...168 4001055180 E 06 21 USA GB Turntable Remove re install the main counterweights MS0138 Notes ...
Страница 192: ...192 4001055180 E 06 21 USA GB Upper boom Remove Replace boom assembly MS0140 Notes ...
Страница 200: ...200 4001055180 E 06 21 USA GB Upper boom Removing Replacing the pads MS0141 Notes ...
Страница 214: ...214 4001055180 E 06 21 USA GB Upper boom Remove Re install output compensation cylinder MS0143 Notes ...
Страница 222: ...222 4001055180 E 06 21 USA GB Upper boom Remove Re install input compensation cylinder MS0144 Notes ...
Страница 230: ...230 4001055180 E 06 21 USA GB Lower arm Remove Replace arm cylinder MS0145 Notes ...
Страница 244: ...244 4001055180 E 06 21 USA GB Electric Battery ies MS0149 Notes ...
Страница 262: ...262 4001055180 E 06 21 USA GB Chassis Remove Re install wheel reduction gear MS0152 Notes ...
Страница 268: ...268 4001055180 E 06 21 USA GB Chassis Wheel tightening procedure MP0001 Notes ...
Страница 272: ...272 4001055180 E 06 21 USA GB Chassis Wheel reducer level procedure MP0002 Notes ...
Страница 276: ...276 4001055180 E 06 21 USA GB Turntable Procedure for checking the level of engine oil MP0003 Notes ...
Страница 284: ...284 4001055180 E 06 21 USA GB Turntable Replacing the engine oil filter MP0004 Notes ...
Страница 288: ...288 4001055180 E 06 21 USA GB Turntable Replacing the engine oil filter Kohler engine MP0004 Notes ...
Страница 292: ...292 4001055180 E 06 21 USA GB Turntable Diesel filter replacement MP0005 Notes ...
Страница 296: ...296 4001055180 E 06 21 USA GB Turntable Diesel filter replacement Kohler engine MP0005 Notes ...
Страница 300: ...300 4001055180 E 06 21 USA GB Turntable Hydraulic oil filter replacement MP0006 Notes ...
Страница 304: ...304 4001055180 E 06 21 USA GB Turntable Procedure for checking engine belt tension MP0007 Notes ...
Страница 312: ...312 4001055180 E 06 21 USA GB Chassis Front axle locking function check MP0008 Notes ...
Страница 316: ...316 4001055180 E 06 21 USA GB Turntable Air filter replacement MP0010 Notes ...
Страница 330: ...330 4001055180 E 06 21 USA GB Platform Rotary cylinder tightness check MP0016 Notes ...
Страница 333: ...333 4001055180 E 06 21 USA GB Platform Checking the platform MP0017 Check the platform access rail or gate ...
Страница 334: ...334 4001055180 E 06 21 USA GB Platform Checking the platform MP0017 Notes ...
Страница 342: ...342 4001055180 E 06 21 USA GB Turntable Slew ring clearance check MP0018 Notes ...
Страница 346: ...346 4001055180 E 06 21 USA GB Turntable Torque tightening of the slew ring MP0019 Notes ...
Страница 350: ...350 4001055180 E 06 21 USA GB Turntable Emptying the diesel tank MP0020 Notes ...
Страница 362: ...362 4001055180 E 06 21 USA GB Turntable Starter battery inspection MP0023 Notes ...
Страница 384: ...384 4001055180 E 06 21 USA GB Turntable Drain the engine oil MP0036 Notes ...
Страница 388: ...388 4001055180 E 06 21 USA GB Turntable Drain the engine oil Kohler engine MP0036 Notes ...
Страница 394: ...394 4001055180 E 06 21 USA GB Turntable Draining the wheel reducer MP0043 Notes ...