background image

Operator’s Manual

Specifications  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  inside cover
Introduction  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   1
Safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   2

California Proposition 65 Warning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   2
Safety Alert Symbols . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   2
Electrocution Hazard. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   3
Tip-over Hazards. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   4
Fall Hazards. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   5
Collision Hazards  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   5
Additional Safety Hazards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   6
Battery Safety. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   6

Controls & Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   7

Component Locations  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   7
Platform Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   8
Lower Controls  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .   9

Workplace Inspection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  10
Operating Instructions & Function Tests. . . . . . . . . . . . . . . . . . . . . . . . . . . . .  11

Prestart. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  11
Functions Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  11
Operating Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  14

Shutdown Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . . 

. . . . . . . . . . . . . . . . . . .  1

7

Battery Charging. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  1

7

Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  

18

Routine Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  

19

Frequent and Annual Maintenance

 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  1

9

Lubrication . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  2

0

Pre-Start Inspection Checklist  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  2

1

Frequent Inspection Checklist

 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  2

2

Annual Inspection Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  2

3

Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  2

4

Transport and Lifting Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  2

5

Loading  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  2

6

Lifting Instructions

 

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .  2

7

1030-PA

1030-PA

 Serial # 210301000 - Up

1OP1

0

30

EN

 

February 2018

Содержание 1030-PA

Страница 1: ...Lower Controls 9 Workplace Inspection 10 Operating Instructions Function Tests 11 Prestart 11 Functions Test 11 Operating Instructions 14 Shutdown Procedure 17 Battery Charging 17 Maintenance 18 Routi...

Страница 2: ...5 m A Platform height maximum 9 9 3 m B Platform height stowed 29 5 75 m Platform length outside stowed C 45 3 1 15 m Platform width outside D 29 3 74 m Toeboard height 6 7 0 17 m E Height stowed 72 8...

Страница 3: ...sential that the operator of the aerial work platform is not alone on the workplace during operation Modifications of this machine from the original design and specifications without written permissio...

Страница 4: ...NSI SIA A92 5 2006 Manual of Responsibilities is considered a part of this machine and can be found in the manual compartment located at the platform control station To ensure safe use of machine insp...

Страница 5: ...lectricallineorapparatuscarryingover300Voltsupto50 000 Volts Onefoot 30 5cm additional clearance is required for every additional 30 000 Volts Observe Minimum Safe Approach Distance This machine is no...

Страница 6: ...ywood Increased surface area exposed to the wind will decrease machine stability DO NOT attach overhanging loads or use the machine as a crane DO NOT place loads outside the platform perimeter NEVER t...

Страница 7: ...terials or other obstructions before moving Check for overhead obstructions before operating Check for crushing hazards when holding the platform rail before operating Be aware of limited sight distan...

Страница 8: ...le Bodily Injury Hazards DO NOT operate the machine when there is a hydraulic fluid or air leak Hydraulic fluid or air under pressure can penetrate and or burn skin All compartments must remain closed...

Страница 9: ...Locations Manuals Case Platform Controls Platform Guardrails Entry Gate Lift Cylinder Chassis Lower Control Station Power Emergency Stop Switch Battery Charger Battery Charge Location Forklift Pockets...

Страница 10: ...roundings before activating any control function CONTROL DESCRIPTION 1 Lift Button Push and hold button to LIFT platform 2 Lower Button Push and hold button to LOWER platform 3 Emergency Stop Switch P...

Страница 11: ...or down to lower the platform 2 Key Switch PLATFORM Select to operate from the platform control panel BASE Select to operate from the lower control panel OFF Select to stop operation from either cont...

Страница 12: ...e correct machine for the job Be aware of workplace conditions and continue to watch for hazards while operating the machine Workplace Inspection Before operating the machine check the workplace for a...

Страница 13: ...tart Inspection and Functions Test prior to operating the machine Operators must comply with all employer and job site rules and governmental regulations regarding the use of personal protective equip...

Страница 14: ...ush up and hold the Platform Up switch Result The platform should raise 11 Push down and hold the Platform Down switch Result The platform should lower to end The descent alarm should sound Test the E...

Страница 15: ...tform should stop rising 19 Press and hold the Lower button on the upper control box Result The platform should lower The descent alarm should sound while the button is pressed 21 Press and hold the L...

Страница 16: ...unctions If any function operates when either red Emergency Stop button is pushed in repair the Emergency Stop function before using the machine Emergency Lowering If the control system fails while th...

Страница 17: ...the machine To Position Platform from Ground Move the up down toggle switch according to the markings on the control panel Operation from Platform Check the area above and around the machine for obst...

Страница 18: ...inspection on the machine with the platform elevated without first blocking the scissor assembly with the Maintenance Lock DO NOT engage the Maintenance Locks unless the platform in empty of tools and...

Страница 19: ...the end of the work day Charge the batteries Battery Charging Thechargersurfacecangethotwhileoperating Contactwiththeskinorsurroundingmaterialsshould be avoided Toreducetheriskofanelectricshock conne...

Страница 20: ...and burn skin damage eyes and may cause serious injury blindness and death Repair leaks immediately Fluid leaks under pressure may not always be visible Check for pin hole leaks with a piece of cardb...

Страница 21: ...m routine maintenance as identified in the Pre Start Inspection Checklist on page 21 Frequent and Annual Maintenance Frequent Inspection Checklists and Annual Inspection Reports must be completed by q...

Страница 22: ...uled Maintenance Change yearly or every 600 hours whichever occurs first Do not substitute other fluids as pump damage may result Fill to the middle of the dipstick with platform in the stowed positio...

Страница 23: ...tery pack and connections _______Slide blocks wear pads _______Wheels _______Ground strap _______Limit switches alarm and beacon _______Nuts bolts and other fasteners _______Platform entry gate ______...

Страница 24: ...cription ______Perform all checks listed on Pre Start Inspection ______Inspect the condition of hydraulic fluid in the reservoir Oil should be a clear and amber in color ______Batteries ______Electric...

Страница 25: ...loses Properly Manual Safety Data In Box Platform Platform Bolts Tight Platform Structure Wire Harnesses Mounted Correctly Physical Appearance 110 220V Outlet Safe Working Elevating Assembly Beam Stru...

Страница 26: ...d report the incident to your supervisor and do not use the machine until it has been checked by a trained qualified mechanic Machine functions will not operate Battery properly connected Battery full...

Страница 27: ...nsible for selecting the correct and appropriate trailer according to government regulations and company policy Drivers must ensure that thevehicleandchains are strong enoughto holdthe weightofthe mac...

Страница 28: ...forks in line with the forklift pockets Drive forward to the full extent of the forks Raise the machine 6 in 15 cm and then tilt the forks back slightly to keep the machine secure Be sure the machine...

Страница 29: ...are of sufficient capacity to withstand the machine weight See the serial plate for the machine weight Fully lower the platform Be sure the controls and component trays are closed and secure Remove al...

Страница 30: ...Global Machinery Group Inc 3428 Bullock Lane San Luis Obispo CA 93401 USA Phone 1 805 303 2066 Toll Free USA Canada 800 303 0499 www goGMG com...

Отзывы: