66
4000562980
E 07.16
USA / GB
General data
Cylinder inspection
MS0003
3.3 - MAJOR INSPECTION
A thorough inspection of the structural parts must be realized all the 5000 h or 10 years with disassembling
of the element to check the entirety of the welding. Each Cylinder must be disassembled and must be review
using non-destructive checks.
The criteria quoted above are applicable :
• Absence of deformation and visible damage.
• Absence of crack, broken welding, oxidation, glare of painting.
Check :
1.
Pipe weld connection.
2.
Rod weld connection.
3.
Ring.
4.
Rod.
5.
Piston.
Содержание STAR 13 P
Страница 1: ...Maintenance Book STAR 6 P STAR 13 P 4000562980 E 07 16 USA GB Maintenance Book STAR 6 P STAR 13 P USA...
Страница 2: ...2 4000562980 E 07 16 USA GB STAR 6 P STAR 13 P...
Страница 10: ...10 4000562980 E 07 16 USA GB STAR 6 P STAR 13 P A Preface Foreword Notes...
Страница 19: ...19 4000562980 E 07 16 USA GB STAR 6 P STAR 13 P C Familiarization Notes Familiarization...
Страница 68: ...68 4000562980 E 07 16 USA GB General data Breaking test procedure MS0004 Notes...
Страница 74: ...74 4000562980 E 07 16 USA GB Electric Electrical wiring MS0059 Notes...
Страница 80: ...80 4000562980 E 07 16 USA GB Chassis Tires Tyres Wheel replacement MS0102 Notes...
Страница 100: ...100 4000562980 E 07 16 USA GB Chassis Pothole cylinder replacement MS0087 Notes...
Страница 104: ...104 4000562980 E 07 16 USA GB Picking tray chain Control Lubrication MS0112 Notes...
Страница 118: ...118 4000562980 E 07 16 USA GB Ground control box HAULOTTE Activ Screen MS0106 Notes...
Страница 128: ...128 4000562980 E 07 16 USA GB STAR 6 P STAR 13 P E Trouble shooting and diagram C a g e p a r t...
Страница 129: ...129 4000562980 E 07 16 USA GB STAR 6 P STAR 13 P E Trouble shooting and diagram 3 Hydraulic diagram...
Страница 130: ...130 4000562980 E 07 16 USA GB STAR 6 P STAR 13 P E Trouble shooting and diagram Notes...