Operation and maintenance
21
4.2 -
OPERATIONS BEFORE FIRST USE
REMINDER:Before any operation, get to know the machine by reading this
manual and the instructions marked on the various plates.
Before using the machine:
• Identify obstacles such as cranes, lifting equipment, construction ma-
chines in the working area.
• Make sure that operators of other overhead or ground level machines
are aware of the presence of the Quick Up.
• The operator must take the safety precautions necessary to avoid all
risks in the work area.
4.2.1 - "Mast" control panel
Photo 1: "Mast" control panel
1 - Mains light indicator
6 - Power on light indicator
2 - Battery light indicator
7 - Emergency lowering push button
3 - Platform/chassis control panel/machine stop selec-
tion
8 - Stabiliser bar OK light indicators
4 - Start push button
9 - Lowering light indicator
5 - Emergency stop push button
OK
307P220190 c
1
2
3
4
6
7
9
5
8
Содержание Quick Up 11
Страница 1: ...OPERATION AND MAINTENANCE INSTRUCTIONS PUSH AROUND Quick Up 7 8 9 11 12 13 14 242 032 9580 E 07 08 GB...
Страница 2: ......
Страница 4: ......
Страница 8: ...Operation and maintenance ii...
Страница 12: ...Operation and maintenance vi...
Страница 23: ...Operation and maintenance 11 2 5 2 Common red labels 3 2 4 5 6 8 10 18 17 307P222920 a 13 KG 28 LBS 22...
Страница 26: ...Operation and maintenance 14...
Страница 28: ...Operation and maintenance 16...
Страница 44: ...Operation and maintenance 32...
Страница 46: ...Operation and maintenance 34...
Страница 47: ...Operation and maintenance 35 7 HYDRAULIC DIAGRAM 7 1 AC VERSION...
Страница 48: ...Operation and maintenance 36 7 2 DC VERSION...
Страница 49: ...Operation and maintenance 37 8 WIRING DIAGRAMS 8 1 AC VERSION...
Страница 50: ...Operation and maintenance 38 8 2 DC VERSION...
Страница 51: ...39 9 REGISTER OF INSPECTION AND REPAIR Date Comments...
Страница 52: ...40 Date Comments...