![Haug Multistat Ex SDN Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/haug/multistat-ex-sdn/multistat-ex-sdn_operating-instructions-manual_2107707015.webp)
5 Operate
15
5
Operate
Preconditions:
The discharging power pack and the ionizing unit are connected and
installed as specified in the operator instructions.
NOTE:
After a fault has occurred, the error lamp starts blinking. The power
pack switches off the HV.
The following occurances may have triggered the fault:
• The high-voltage on the HS output has dropped below ~ 4.2
kV.
• A flashover in the ionisation system may have been the cause.
• A short circuit in the ionisation system may have been the
cause.
Resetting the power pack is effected by triggering a reset. If a fault
persists, follow the instructions in the Chapter “Troubleshooting”.
Refer page 19.
5.1
Normal operation
Operating the power pack without monitoring it. K1 and K6 signal
sockets are not connected.
1. Use the power switch to turn on the power pack.
• To verify this, the green power switch is illuminated.
• The HV output voltage is indicated on the HV display of the
power pack.
• The power pack is running.
NOTE:
The flashing of the error indicator lamp indicates a defect. The
discharging power pack can be reset by pressing the reset
pushbutton. If the defect persists, refer to the following chapter
“Troubleshooting”. Refer page 19.
Содержание Multistat Ex SDN
Страница 2: ......
Страница 29: ......
Страница 30: ...NOTES...
Страница 31: ......
Страница 32: ...Multistat Ex SDN v02 1gb docx V02 1 17 09 2018 D 0370 GB made by...