![Hauff-Technik MSH-FW Basic-FUBO-FIX Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/hauff-technik/msh-fw-basic-fubo-fix/msh-fw-basic-fubo-fix_assembly-instruction-manual_2107688034.webp)
Art. Nr.: 5090032100
Rev.: 01/2018-07-09
34
MSH Basic-FUBO-FIX
EN
Fig.: 14
Fig.: 13
at least 50 mm
FFB
RFB
Fig.: 15
•
Finally, check all measurements in order to
observe wall clearance.
Recommended wall clearance: at least 50 mm
(see Fig.: 15).
•
On the MSH Basic-FUBO-E there is a label/mar-
king:
"Upper edge unfi nished fl oor height"
.
When correctly positioned, the upper edge of
the wall sleeve stands approx. 190 mm above
the unfi nished fl oor (RFB) after concreting. The
system allows shortening of the wall sleeve by
120 mm to fi nished fl oor level later.
After this, align the MSH Basic-FUBO-E with the MSH
Basic-FUBO-FIX using a spirit level.
In doing so, set the adjustable ground spikes to unfi nished
fl oor height using the side marking
("Upper edge unfi -
nished fl oor height" – RFB)
of the MSH Basic-FUBO-E
(see Fig.: 14).
8
7
Turn the MSH Basic-FUBO-E with installed KES hose systems
around again.
Place rubber adaptor with fastening bow over the installed
threaded pins of the moulding strip and install (see Fig.: 13).