9 |
P a g e
2.0 INSTALLATION
2.6 Piping Line Flush
NOTE: VALVES SHOWN
SUPPLIED BY OTHERS
1) Close valves on chiller. Remove
protective cap from purge valves supply
and return, and connect hose to each of
the ¾” GHT (garden hose thread)
connections.
NOTE: TYPICAL SETUP SHOWN
2)
Open both supply and return purge
valves and flush system with city water
until water runs clear, continue to flush
for an additional 20 minutes.
NOTE: DO NOT OPEN
ISOLATION VALVES DURING
FLUSHING PROCESS.
OPC
Typical Connection size
Model
supply & return
12
1.5" NPT
Wye Strainer
Return pressure gauge
Supply valve
Return valve
Supply line purge valve
Supply tank drain valve
Return valve line purge
Hose barbs supplied by others
Содержание OPC 12
Страница 7: ...4 P a g e 2 0 INSTALLATION 2 2 System Location Continued ...
Страница 8: ...5 P a g e 2 0 INSTALLATION ...
Страница 15: ...12 P a g e 2 0 INSTALLATION ...
Страница 26: ...23 P a g e 6 0 WARRANTY 5 0 MAINTENANCE ...
Страница 27: ...24 P a g e 6 0 WARRANTY 5 0 MAINTENANCE ...
Страница 28: ...25 P a g e 6 0 WARRANTY 5 0 MAINTENANCE ...
Страница 29: ...26 P a g e 6 0 WARRANTY 5 0 MAINTENANCE ...
Страница 30: ...27 P a g e 6 0 WARRANTY 5 0 MAINTENANCE ...
Страница 32: ...29 P a g e 6 0 WARRANTY 5 0 MAINTENANCE ...
Страница 33: ...30 P a g e 6 0 WARRANTY 5 0 MAINTENANCE 6 1 Standard Product Warranty 6 0 WARRANTY ...
Страница 35: ...32 P a g e 6 0 WARRANTY 7 0 ELECTRICAL AND PIPING DIAGRAMS ...
Страница 36: ...33 P a g e 6 0 WARRANTY 7 0 ELECTRICAL AND PIPING DIAGRAMS ...