ASSEMBLY AND INSTALLATION
33
6
6-10 ATTACHING TOP BOX
● The Top Box weighs in excess of 20kg. Use at least two people when carrying
out this operation. Trying to carry out this work single handedly may result in
injury or component damage.
1
Using at least two people and adequate
ladders and/or stepping equipment, raise
the top box into position and align with the
fixing points on the top of the cabinet.
2
Secure the (1) M8 fixing within the ASSY ROOF PANEL in the orientation “up” (starting from inside the
cabinet with the fixing facing out).
FIG. 6-10a
FIG. 6-10b
TOP BOX
Содержание Sega Transformers Shadows Rising
Страница 17: ...4 PRECAUTIONS REGARDING INSTALLATION LOCATION 2 440 WS100UK LABEL FORK HERE 440 PL100UK LABEL PACKING...
Страница 136: ...PARTS LIST 123 18 2 ASSY BILLBOARD TS 0500UK D 1 2 1...
Страница 146: ...PARTS LIST 133 18 8 ASSY GUN CABINET TS 5100UK D 1 2 201 6 202 6 203 6 204 4 205 4 206 4 207 4 1 3 1 2 12...
Страница 162: ...PARTS LIST 149 18 20 ASSY INST KIT TS INST TH D 1 3...
Страница 169: ...4 of 4...