![harvst Sprout S6 Mini Скачать руководство пользователя страница 15](http://html1.mh-extra.com/html/harvst/sprout-s6-mini/sprout-s6-mini_setup-manual_2104150015.webp)
Step 13 - Add the lid prop support bolts
Parts
2 x M5 x 16mm button head bolt
2 x M5 nut
The nyloc nut has a little plastic
ring inside to prevent it loosening
over time.
Screw the two nuts onto the bolts until they are 2mm
away from being fully tightened.
Slide the heads of the bolts down the inner slot on the
top right of the greenhouse, as shown in the drawing
below.
Slide one all the way to 40mm off the bottom and leave
the other one near the top.
Holding the bolt thread, tighten the nut to create a stud.
The lower / front stud goes through the lid prop with a
nyloc nut on it.
The top / rear stud is used to rest the lid prop when not
in use.
Step 14 - Fit the lid prop
Parts
1 x lid prop, 40cm
1 x M5 nyloc nut
Note:
The nyloc nut has a little plastic ring
inside to prevent it loosening over time.
Put the hole in the lid prop over the lower
stud that you inserted above.
Put on the nyloc nut, tightening it just so that
the plastic “bites” the thread. The prop
should be loose enough to move around.