background image

Thank you for buying a Harvst greenhouse.

If you have any questions while setting up, send us an email
([email protected]) or have a look at our forums at

https://grow.harvst.co.uk

There are also videos at  https://www.harvst.co.uk/setup

Important information

Sprout mini greenhouses are intended for outdoor garden use, fixed securely to a fence, wall or

the ground. Use outdoors unsecured, or indoors, is at your own risk.

Mains powered greenhouses are provided with a waterproof power supply and 5m of mains

cable. They should be plugged into a waterproof outdoor socket, or an indoor socket in a shed,

garage or other safe place. Non waterproof extension leads should never be used.

Содержание Sprout S10 Mini

Страница 1: ...Setup guide Model S10 Greenhouse only Solar 3 season and 4 season versions 4 season shown above...

Страница 2: ...rtant information Sprout mini greenhouses are intended for outdoor garden use fixed securely to a fence wall or the ground Use outdoors unsecured or indoors is at your own risk Mains powered greenhous...

Страница 3: ...Exploded diagram Visit www harvst co uk setup for more information videos and photos...

Страница 4: ...00mm x2 Lid front rear crossbar 600mm x1 Front upper crossbar box profile as alternative 610mm Shelf support x4 GH 3 season Solar x8 4 season model 600mm x1 Front centre crossbar 405mm x1 With one hol...

Страница 5: ...Parts clear panels...

Страница 6: ...er supply are fitted after the greenhouse is built Parts other Tools provided 3mm allen key 8mm spanner Pozidrive screwdriver Tools required Tape measure Secateurs for cutting pipe Mesh shelves You wi...

Страница 7: ...Nyloc x1 M5 nut x8 M5 square nut x22 4 5 x 30 screw x4 10cm cable ties M5 washer x2 Blanking plug x14 Joining strap x2 Lid top plate x1 Mounting plate x1 May be slot head M4 x 12mm x2 M4 nut x2 3mm a...

Страница 8: ...SNAP OFF THE HEAD WHICH IS NOT COVERED BY WARRANTY Step 1 Seal the polycarbonate panels optional Twin wall polycarbonate panels act like double glazing for your mini greenhouse and to improve the insu...

Страница 9: ...olycarbonate door Fix the door handles to the doors as shown in the drawing above using the tape fixed to the handles Make sure you have peeled the protective film off the doors first the surfaces are...

Страница 10: ...ss the screws at the bottom such as a table or workbench Link the front and rear assemblies using the 45 cm side base parts The closed faces on the assembly uprights face outside the greenhouse The si...

Страница 11: ...ut a square nut on the back of each loosely Slide the square nuts into the outside channel of the rear uprights and tighten the lower pair of bolts It can be a little fiddly to get the square nuts to...

Страница 12: ...panel on the left has a hole with grommets in it for an external hose or tank connection if you have a solar 3 season or 4 season model Parts 8 x clear side panel 2 x clear top side panel 4 x side cro...

Страница 13: ...Lower rear panel and rear crossbar Parts 1 x Lower rear panel the smaller one 1 x Rear cross bar 60cm with screws in Slide the rear panel into the slots on the rear of the greenhouse all the way into...

Страница 14: ...annels on the uprights Screw the 10mm bolt into the square nut which is already in the outside channel of the assembly and tighten by hand This will form part of the storm lock see end of guide The fr...

Страница 15: ...bar slot method Parts 1 x front upper cross bar 60cm 1 x bracket assembly from above 2 x M5 x 8mm button head 2 x M5 square nut Slide two square nuts into the rear channel of the bar the side opposite...

Страница 16: ...the front of the greenhouse Tighten securely Optional step fit pipe clips If you have a greenhouse with self watering it will be easiest to fit the pipe clips before adding the mesh shelves Parts from...

Страница 17: ...you insert the shelf supports Slot the shelf supports into the slots on the inside of the side panel cross bars inserting them at a diagonal and then straightening up Place the mesh shelves onto the s...

Страница 18: ...e top Holding the bolt thread tighten the nut to create a stud The lower front stud goes through the lid prop with a nyloc nut on it The top rear stud is used to rest the lid prop when not in use Step...

Страница 19: ...uts and tighten them by hand to lock them in place Fit the o ring over the two bolts on the side of the lid The drawing above shows what the lock will look like when in operation holding the lid down...

Страница 20: ...th the black channel facing up with the holes over the edge Parts 2 x M4 x 16mm bolt 2 x M4 nut 1 x lid top plate 1 x lid lifter Place the lid lifter so that the bracket with slots in is above the two...

Страница 21: ...t on the inside of the front upper bar Step 23 Fit the ridge to the lid Parts 1 x assembled lid 1 x ridge 2 x blanking plugs Fit the blanking plugs when the screws are fully tightened Step 24 Fit the...

Страница 22: ...channels by flexing them slightly The left hand door goes in the rear inside channel and the right hand door goes in the front outside channel Step 27 Fit the hole caps We ve supplied some small blac...

Страница 23: ...matic lid lifter avoid opening the lid against the pressure of the piston too frequently Open the front doors unclip the lifter mechanism and then open the lid The lid opener piston is not covered und...

Отзывы: