EN
Installation instructions, only for experts
p. 19/28
U1
V1
W1
N
U2
V2
W2
N
PE
PE
Connection of Qube 12 kW and 15 kW
(QUBE-120 / QUBE-150)
1. Guide the connection cable for the sauna control unit through the feed-
through
6
.
2. Connect the connectors of this connection cable to the U1 – V1 – W1 – N – PE
terminals on the connector block
7
and to the applicable sauna control unit
terminals. Observe the installation instructions for the sauna control unit when
doing so.
3. Guide the booster cable through the feed-through
5
.
4. Connect the connectors of the booster cable to the U2 – V2 – W2 – N – PE
terminals on the connector block
4
and to the applicable booster terminals.
Observe the installation instructions of the booster when doing so.
5. Reattach the cover panel
1
to the heater.
4
5
7
6
4
Connector block for the booster
5
Feed-through for the booster cable
6
Feed-through for the connection cable for the sauna control unit
7
Connector block for the sauna control unit
Содержание sentiotec Qube
Страница 28: ...NOTIZEN APPUNTI NOTES NOTE NOTITIES ...
Страница 56: ...NOTIZEN APPUNTI NOTES NOTE NOTITIES ...
Страница 84: ...NOTIZEN APPUNTI NOTES NOTE NOTITIES ...
Страница 112: ...NOTIZEN APPUNTI NOTES NOTE NOTITIES ...
Страница 140: ...NOTIZEN APPUNTI NOTES NOTE NOTITIES ...
Страница 168: ...NOTIZEN APPUNTI NOTES NOTE NOTITIES ANTECKNINGAR ...
Страница 196: ...NOTIZEN APPUNTI NOTES NOTE NOTITIES ...
Страница 224: ...NOTIZEN APPUNTI NOTES NOTE NOTITIES BELEŽKE ...