VOL-033 & 034
SITTING VOLLEYBALL POST (BOLT DOWN OR SELF WEIGHTED)
Code:
Product:
Code:
Product:
Code:
Product:
Code:
Product:
MAKE SURE YOU READ THESE INSTRUCTIONS
CAREFULLY BEFORE ASSEMBLING YOUR POSTS
Floor Socket Installation
All sockets should be installed by a specialist, using the following guidelines.
Please contact your distributor for recommended specialist fitting engineers.
Mark at location shown below. Drill Ø20 holes to the depth to suite purchased sockets.
are 8351mm (8.351m)
(NOTE: 8300mm (8.3m) is Harrod Suggested hole Centres,
this can range between 8300mm (8.3m) to 9300mm (9.3m)
are 8511mm x 400mm (8.511m x 0.4m).
(NOTE: 8500mm (8.5m) is Harrod Suggested hole Centres,
this can range between 8500mm (8.5m) to 9500mm (9.5m)
Note: Longer Sockets are required for sprung floors. (Contact your distributor for guidance).
2 Point Socket Centres
4 Point Socket centres
Floor sockets are not included and should be ordered separately.
Solid Floors required 2 off SHP-001
- (or 4 if using rear fixing points)
Suspended Floors require 2 off SHP-100
- (or 4 if using rear fixing points)
500mm
500mm
6500mm
6000mm (6m) Outer Sidelines of Court
7500mm (7.5m) To Front of Posts
500mm to
1000mm
500mm to
1000mm
400mm
(0.4m)
Hole
Centres
8686mm (8.686m) Outside of Posts
8511mm (8.511m) - 4 Hole Socket Centre
8351mm (8.351m) - 2 Hole Socket Centre
FOUR HOLE CENTRE INSTALLATIONS GUIDE
TWO HOLE CENTRE INSTALLATION GUIDE
Net Not Included
PAGE 2