background image

VOL-033 & 034

SITTING VOLLEYBALL POST (BOLT DOWN OR SELF WEIGHTED)

Code:

Product:

Code:

Product:

Code:

Product:

Code:

Product:

MAKE SURE YOU READ THESE INSTRUCTIONS

CAREFULLY BEFORE ASSEMBLING YOUR POSTS

Floor Socket Installation

All sockets should be installed by a specialist, using the following guidelines.

Please contact your distributor for recommended specialist fitting engineers.

Mark at location shown below. Drill Ø20 holes to the depth to suite purchased sockets.

are 8351mm (8.351m)

(NOTE: 8300mm (8.3m) is Harrod Suggested hole Centres,

this can range between 8300mm (8.3m) to 9300mm (9.3m)

are 8511mm x 400mm (8.511m x 0.4m).

(NOTE: 8500mm (8.5m) is Harrod Suggested hole Centres,

this can range between 8500mm (8.5m) to 9500mm (9.5m)

Note: Longer Sockets are required for sprung floors. (Contact your distributor for guidance).

2 Point Socket Centres

4 Point Socket centres

Floor sockets are not included and should be ordered separately.

Solid Floors required 2 off SHP-001

- (or 4 if using rear fixing points)

Suspended Floors require 2 off SHP-100

- (or 4 if using rear fixing points)

500mm

500mm

6500mm

6000mm (6m) Outer Sidelines of Court

7500mm (7.5m) To Front of Posts

500mm to

1000mm

500mm to

1000mm

400mm

(0.4m)

Hole

Centres

8686mm (8.686m) Outside of Posts

8511mm (8.511m) - 4 Hole Socket Centre

8351mm (8.351m) - 2 Hole Socket Centre

FOUR HOLE CENTRE INSTALLATIONS GUIDE

TWO HOLE CENTRE INSTALLATION GUIDE

Net Not Included

PAGE 2

Отзывы: