36
Figure 3-33 Suspension Shafts
3.4.1
Adjusting the trolley width – After assembling trolley per
Section 3.5
, check the adjustment as follows:
1)
Refer to
Figure 3-34
.
2)
Make sure both side plates are spread fully outward and measure dimension “A”. Compare dimension “A”
with the following values:
For trolleys up through 5 Ton, “A” must be 3/32” to 5/32” greater than “B”.
For trolleys 8 Ton to 20 Ton, “A” must be 3/16” to 1/4” greater than “B”.
3)
If “A” does not fall within the specified range, move spacers from inner to outer or from outer to inner as
necessary to obtain the proper “A” dimension, irrespective of the numbers in
Table 3-2
.
4)
After obtaining the proper adjustment, install the Shaft stopper Pin, insert the Split Pin into the Stopper Shaft
Pin, and securely bend both branches of the Split Pin.
For trolleys 8 Ton to 20 Ton, make sure to insert Shaft Stopper Pin into Hole
“A”. HOLE “B” IS FOR TROLLEY INSTALLATION ONLY.
5)
Because two traversing units are combined in the 15 and 20 Ton trolley, ALWAYS adjust both units in the
same way.
Содержание TF2 Series
Страница 37: ...37 Figure 3 34 Adjusting the Trolley...
Страница 66: ...66 8 3 TS2 Push Trolley Parts 1 8 to 5 Ton TS2 Push Trolley 1 2 to 3 Ton TS2 Push Trolley 5 Ton Figure 8 3...
Страница 74: ...74 8 7 TF TS Geared Trolley Parts for CB Hoist 15 to 20 Ton TF TS Trolley for CB Hoist 15 to 20 Ton...
Страница 77: ...77 This Page Intentionally Left Blank...
Страница 78: ...78 8 8 TF TS Geared Trolley Parts for ER2 Hoist 15 to 20 Ton TF TS Trolley for ER2 Hoist 15 to 20 Ton...