14
P43 Pellet Stove
#8 installing through the ceiling
Through the ceiling vent, follow PLvent manufacturers
recommendations when using wall and ceiling pass
through.
note: do not place joints within wall
pass-throughs.
Fig. 14
PL vent manufacturer's
firestop spacer and
support
(See Page 7 for
corner installation
clearances)
Minimum flue vent
configuration
It is required that outside air
be installed with this venting
configuration to reduce smoke
and creosote smell in the room
in the event of power failure.
Min. above ground level
18"
Storm collar
Flashing
3" min.
3" min.
12" min.
3" min.
venting
Fig. 15
3" min.
No insulation or
other combustible
m a t e r i a l s a r e
a l l o w e d w i t h i n
3" of the pellet
vent pipe. Unless
specified by the
pipe manufacturer
12" min. wall to outlet
36" min clearance to any
combustible material
Fig. 16
Содержание P43
Страница 2: ......
Страница 39: ...39 P43 Pellet Stove Service Maintenance Log Date Of Service Performed By Description Of Service...
Страница 40: ...Proudly Printed On 100 Recycled Paper...