background image

3

3-90-774256_R4  •  03/21

Electrical Installation

 (If Needed)

A knockout is provided in the left rear corner of the zero 

clearance cabinet to install an electrical outlet (not supplied) 

if desired. Be sure to ground the receptacle to the zero 

clearance cabinet if installed. Figure 8.

Flue Rough-In Support Kit

Flue rough-in support #1-00-774283 installs in the zero 

clearance cabinet and provides a flue stub mounting surface 

which will be in the exact position of the stub when it is on 

the insert mounting frame. Figure 9.
If you have not yet purchased the insert, order stub kit # 

1-00-674040. This kit includes a 4” pipe stub, gasket and 

mounting bolts. If you do have the insert, remove the flue 

stub from the mounting frame. Install the exhaust stub onto 

the support using the bolts and nuts from the support kit. 

Install with bolts passing upward, through the support plate 

and the flange nuts on the top. If installing the outside air kit, 

install the stub from the kit onto the left side of the support. 

It is not necessary to install the gaskets on the support 

plate,  however  you  will  need  them  for  final  attachment. 

Next, using 8 tek screws, install the rough in support into 

the cabinet. You can now run your venting and air intake 

and permanently attach them to their respective stubs. Be 

sure to properly secure both, the venting and the outside air 

pipe, so that they cannot move when you remove the rough-

in support. When all of the construction is completed, and 

you are ready to install the insert, remove the support plate, 

leaving the stubs in place. Install the insert mounting frame 

and bolt the stub(s) and gasket(s) to the frame. 

IMPORTANT! Install the stub gasket between the stub 

and the mounting frame.

Figure 9

Figure 8

Electrical Knockouts

Отзывы: