Harman® • P35i-C Installation Manual_R2 • 2019 -___ • 02/20
3
8390-784i
Installation Standard Work Checklist
ATTENTION INSTALLER:
Follow this Standard Work Checklist
This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in
this installation manual.
Customer:
________________________________
Date Installed:
__________________________
Lot/Address: ________________________________
Location of Stove:
__________________________
________________________________
Installer: __________________________
Model: ________________________________
Dealer/Distributer Ph # __________________________
Serial Number:
__________________________
!
WARNING! Risk of Fire or Explosion! Failure to install appliance to these instructions can lead to a fire
or explosion.
Appliance Install Section 3
YES
IF NO, WHY?
Required non-combustible floor protection
________________________________
Verified clearances to combustible.
________________________________
Unit is Leveled and secured.
________________________________
Venting/Chimney Section 4
Venting Configuration complies to vent diagrams.
________________________________
Venting installed, sealed and secured in place with proper clearances.
________________________________
Exterior wall/roof flashing installed and sealed
________________________________
Terminations installed and sealed.
________________________________
Electrical Section 1
120 VAC unswitched power provided to the appliance.
________________________________
Check outlet with multi-meter for proper voltage. (115-120 VAC)
________________________________
Record voltage reading: ___________
Appliance Setup Section 5
All packaging and protective materials are removed
________________________________
Accessories installed properly
________________________________
Manual bag and all it’s contents are removed from inside the appliance
and given to party responsible for use and operation
________________________________
Started appliance and verified that all motors and blowers operate
as they should.
________________________________
Checked draft using a Manometer. Record readings: __________
________________________________
Hearth and Home Technologies recommends the following:
Photographing the installation and copying this checklist for your file.
This checklist remain visible at all times on the appliance until the installation is complete.
Comments: Further description of the issues, who is responsible (Installer/Builder/Other Trades, etc.) and corrective action
needed __________________________________________________________________________________________
_________________________________________________________________________________________________
_________________________________________________________________________________________________
Comments communicated to party responsible____________________ by ________________________ on __________
(Builder / Gen Contractor) (Installer)
(Date)
04/17