Harman® • P35i-C Installation Manual_R2 • 2019 -___ • 02/20
22
8390-784i
B. Control Board Installation
The control board is packaged in a static resistant bag. Use
care when handling, hold the control board only by the edges.
Using (4) #10 sheet metal screws located in the hardware
pack, install the control door hinge and control board
assembly to the left side wing surround, Figure 5.5.
R O U T E P O W E R C O R D AWAY F R O M T H E
APPLIANCE. DO NOT RUN THE CORD UNDER OR
IN FRONT OF THE APPLIANCE.
WARNING
!
D. Routing the Power Cord
When choosing an electrical supply outlet, be sure the
polarity is correct, and that the supplied voltage is within
the range of 117 to 123 Volts. Surge protection is also
recommended to protect the control board software in the
event of a surge or spike.
Once the outlet location is decided, you'll need to install and
route the power cord.
Remove the power cord from the ash pan.
At the bottom of each of the side
surround panels is a knockout
for the cord retainer. Remove the
appropriate knockout and feed
the loose wire end of the power
cord into the hole. If your cord
needs to exit from the right side,
route the cord up the side and
over the top of the mounting frame
and back down the left side. Use
the two hooks on the top corners
of the mounting frame to secure
the cord. Attach a star washer,
the ground wire ring terminal, a
second star washer, the ring terminal from the ground wire
jumper to the bottom stud of the left surround panel. Using
a pliers, compress the cord clamp and push it into the hole.
Figure 5.5
- Install control board assembly.
(4) #10 sheet metal
Screws
Control door hinge
Control board assy.
C. Securing the Mounting Frame
The mounting frame is the anchor for the appliance. If
the frame is not secured properly, shifting will occur
when sliding the insert in or out.
The stove is supplied with (4) 5/16-18 Hex Head bolts located
in the hardware pack for leg levelers. These bolts should be
threaded down through the holes to raise the frame corners
as needed to make the frame level as needed, Figure 5.6.
Install the coupler nut weldments to the frame in the hole
location that suits your needs with the (4) 1/4-20 x 5/8 flange
screws and nuts and 1/2” jack bolts. Install the mounting
frame into the opening and adjust these bolts to insure the
frame is level, Figure 5.7.
Note:
The use of all 4 leveling bolts may not be necessary.
Tighten the 1/2" jack bolts against the lintel.
Leveler Bolts
Figure 5.6
1/2" threaded jack
bolts with nuts
Coupler weldment
and (4) 1/4-20 x
5/8" Flange bolts
Tighten the 1/2" jack bolts against the lintel using a wrench on the
1/2” nuts supplied on the jack bolts.
Figure 5.7
- Install jack bolts