Potential scrap risk on materials
Note:
1.
Make sure all the location where need to be fixed by screws must be even.
2.
After reassembly, try to press one passive radiator and observe the another if it can stand up or take more than 10s to
recover flat. If yes, it should be OK if you have no special sealing equipments to test
3.
Before test the set, the glue should be held for 4 hours for drying.
2017-1-23
CONFIDENTIAL
10
Material
Part
Number
Process Step
p
Step
1/2
Fabric grille
Please
refer
to
the
SBOM
St
Step
ep
3/6/7
3/6/7
Speak
Speakeerr
Step
12
Key
board
rubber
button
pad
Step
14
LED
board
rubber
button
pad
EV
EVA
A
St
Step
ep
3/6/7
3/6/7
Содержание JBL FLIP 4
Страница 13: ...6 System Block Diagram...
Страница 19: ...7 6 f e c d b a C803 C804 J310 1 2 3 Circuit Diagram AUX Board J301 CK3 5 97 04 ESD0402V18C15 ESD0402V18C15...
Страница 23: ...7 10 Print Layout Main Board...
Страница 24: ...7 11 Print Layout AUX Board...
Страница 25: ...7 12 Print Layout KEY LED Board...
Страница 26: ...7 13 Print Layout USB Board...
Страница 27: ...7 14 Print Layout KEY Board...
Страница 32: ...VPG1A1143AF GIFT BOX FLIP4GRY AN 3rd choice 1 CPN1A042 CORRUGATED BOARD FLIP4 AN 1...
Страница 33: ...Version 1 5 Some P N and Pos No and Description on Exploded View corrected add Pos 10 KEY PCB RUBBER 2019 03...