background image

Accentra 52i Pellet Insert Zero Clearance Cabinet

Part #1-00-574323

8

There are 4 holes located in the bottom of the 

cabinet that match the holes in the mounting 

frame of the insert. They are to be used to 

secure the insert mounting frame into the 

cabinet after rough-in has been complete.

There are 4 cabinet mounting holes in 

the bottom that go all the way through 

the base of the cabinet. These holes 

allow the installer to secure the 

cabinet to the hearth sub framing.

Mounting  holes  for  outside  air 

rough-in-support brackets.

Mounting  holes  for  flue 

rough-in-support brackets.

accentra 52i footprint when 

installed into a cabinet

Accin 52i Mounting Frame

Содержание Accentra 52i

Страница 1: ...Insert Zero Clearance Cabinet Part 1 00 574323 R Todd Instruction Sheets_3 89 574323_RevF www harmanstoves com Accentra 52i Pellet Insert ZC Cabinet Accentra 52i Pellet Insert Mounting Frame Accentra...

Страница 2: ...the bottom Notice the bend at the rear of the cabinet will make the corner and at the front it will be bent outward to make the facing flange Line up the holes and secure the side panel to the bottom...

Страница 3: ...ls Note When Fiberglass insulation is placed directly on top of the ZC Cabinet it should not touch the pipe The outer ring knockout of the flue pipe opening is designed to install a standard 6 sheetme...

Страница 4: ...ccentra Insert They are only to secure cabinet to the wall framing Adequate framing under the hearth and ZC cabinet MUST be provided The finished face of the fireplace facade MUST be flush with the ZC...

Страница 5: ...of the fireplace facade MUST be flush with the ZC Cabinet front face when completed NOTE See following pages for rough in instructions for other facing materials NOTE When fiberglass insulation is pl...

Страница 6: ...Accentra 52i Pellet Insert Zero Clearance Cabinet Part 1 00 574323 6 28 3 16 29 9 16 Rough Opening Minimum Minimum Depth 16 7 8...

Страница 7: ...L Vent Pipe 1 00 574034 Drill 10x3 4 Tek Screws Precut Alignment Hole 4 1 4 20 x 5 8 thread cutters hold the starter collar into place until the Accentra 52i mounting frame is installed Drill 10x3 4 T...

Страница 8: ...ting frame into the cabinet after rough in has been complete There are 4 cabinet mounting holes in the bottom that go all the way through the base of the cabinet These holes allow the installer to sec...

Страница 9: ...fiberglass insulation is placed directly on top of the ZC Cabinet it should not touch the vent pipe The outer ring knockout of the flue pipe opening is designed to install a standard 6 sheetmetal star...

Страница 10: ...r PL Vent manufacturer s firestop space and support Venting clearances for in room installation of the Zero Clearance Cabinet NOTE Illustrations reflect typical installations and are FOR DESIGN PURPOS...

Отзывы: