Accentra 52i Pellet Insert Zero Clearance Cabinet

Part #1-00-574323

5

Caution should be taken NOT TO HAVE a stud within 5” of the center line 

of the flue pipe. (Use PL Vent Pipe ONLY)

This should allow room for any PL Vent certified wall pass through.

The  finished  face  of  the  fireplace  facade,  “MUST”  be  flush  with  the  ZC 

Cabinet front face when completed.

NOTE:

 See following pages for rough-in 

instructions for other facing materials.

NOTE:

  When  fiberglass  insulation  is 

placed directly on top of the ZC Cabinet 

it should not touch the vent pipe. The 

outer  ring  knock  out  of  the  flue  pipe 

opening is designed to install a standard 

6” sheet metal starter collar and a short 

length of pipe to keep the insulation from 

touching the vent pipe.

Содержание Accentra 52i

Страница 1: ...Insert Zero Clearance Cabinet Part 1 00 574323 R Todd Instruction Sheets_3 89 574323_RevF www harmanstoves com Accentra 52i Pellet Insert ZC Cabinet Accentra 52i Pellet Insert Mounting Frame Accentra...

Страница 2: ...the bottom Notice the bend at the rear of the cabinet will make the corner and at the front it will be bent outward to make the facing flange Line up the holes and secure the side panel to the bottom...

Страница 3: ...ls Note When Fiberglass insulation is placed directly on top of the ZC Cabinet it should not touch the pipe The outer ring knockout of the flue pipe opening is designed to install a standard 6 sheetme...

Страница 4: ...ccentra Insert They are only to secure cabinet to the wall framing Adequate framing under the hearth and ZC cabinet MUST be provided The finished face of the fireplace facade MUST be flush with the ZC...

Страница 5: ...of the fireplace facade MUST be flush with the ZC Cabinet front face when completed NOTE See following pages for rough in instructions for other facing materials NOTE When fiberglass insulation is pl...

Страница 6: ...Accentra 52i Pellet Insert Zero Clearance Cabinet Part 1 00 574323 6 28 3 16 29 9 16 Rough Opening Minimum Minimum Depth 16 7 8...

Страница 7: ...L Vent Pipe 1 00 574034 Drill 10x3 4 Tek Screws Precut Alignment Hole 4 1 4 20 x 5 8 thread cutters hold the starter collar into place until the Accentra 52i mounting frame is installed Drill 10x3 4 T...

Страница 8: ...ting frame into the cabinet after rough in has been complete There are 4 cabinet mounting holes in the bottom that go all the way through the base of the cabinet These holes allow the installer to sec...

Страница 9: ...fiberglass insulation is placed directly on top of the ZC Cabinet it should not touch the vent pipe The outer ring knockout of the flue pipe opening is designed to install a standard 6 sheetmetal star...

Страница 10: ...r PL Vent manufacturer s firestop space and support Venting clearances for in room installation of the Zero Clearance Cabinet NOTE Illustrations reflect typical installations and are FOR DESIGN PURPOS...

Отзывы: