Special Instructions

1

2

3

3

4

5

6

7

8

Hot Water Out

Cold Water In

Temp. / Pressure

    Relief Valve

Aquastat, close on rise.

         Optional

Automatic

Air Valve

Pressure Relief

Valve - Must be 

within 2 ft. of coil

Optional Gate

Valve to Control

Rate of Flow

Circulator Pump

Drain

Valve

Distance between of more than 10 feet

Circulating Pump method - distance = 10 Feet or more

This method is used when the water heater tank is more than ten feet away from the furnace or the fur-

nace is on a higher level than the water heater tank. In addition to a circulator pump, you may want to add 

a aquastat to thermostatically control the pump according to water temperature. This is optional and not 

necessary if the circulator pump is left run continuously. Another option is a gate valve placed near the 

pump to control the rate of water flow. 

A. Shut off the water heater and the water supply to it. Drain the tank completely.

B. Remove the Temp. / Presure relief valve and discard. Install a short 3/4 in. nipple and tee () along with 

a new relief valve. 

C. Remove the drain valve, at the bottom of the tank. Install a short 3/4 in. nipple and tee and re-install the 

drain valve to the tee (4). 

D. Install a circulating pump as shown (6). Run 3/4” copper tubing from the circulating pump to the lower 

leg of the water coil. This is where the optional gate valve (5) can be installed to regulate flow.

E. Install a 3/4 in. tee and a 50 lb. Pressure relief valve (7) in the top leg within two feet of the coil.

F. Complete the 3/4 in. line by running it back to the tee at the top of the water heater tank. Be sure to 

install the 3/4 in. vent elbow and automatic air vent () at the high point of the line. The optional aquastat 

can be installed in this line, a maximum of 6 feet from the furnace. This aquastat must close on rise in tem-

perature and must be hooked up to turn on the circulator when the water temperature reaches 0° f. 

G. After securing all connections, refill the tank with water and then, ONLY THEN, turn on the power to the 

water heater.

Содержание SF 3500A

Страница 1: ...E MAY RESULT FOR YOUR SAFETY FOL LOW INSTALLATION DIRECTIONS CONTACT LOCAL BUILDING OR FIRE OFFICIALS ABOUT RESTRICTIONS AND INSTALLATION INSPECTION REQUIREMENTS IN YOUR AREA Contact your local authority such as municipal building department fire department fire prevention bureau etc to determine the need for a permit Cette guide d utilisation est disponible en francais Chez votre concessionnaire ...

Страница 2: ...Packing List 3 Installation 5 Mounting Blower Filter Box 7 Wiring 8 Duct Work 11 Operation 11 Safety Tips 13 Chimney Troubleshooting 13 Maintenance 14 Specifications 15 Coil Installation 16 Oil Burner Setup 18 Warranty 19 ...

Страница 3: ...t Snap Disc 4 1 4 X 3 4 bolts 4 Filter Box Mounting Clips 36 Flex Conduit 1 Straight Conduit Fitting 1 Elbow Conduit Fitting Ash Pan Shaker Handle Owner s Manual Warranty Registration Filter Box Mounting Clips Flex Conduit and Fittings Junction Boxes Ash Pan Shaker Handle Oil Burner Oil Burner Gasket 3 Speed Fan Switch Fan Control High Limit Relay Snap Disc Thermostats Blower Brackets Filter Box K...

Страница 4: ...mostat Junction Box Relay 4 1 4 X 3 4 bolts 4 Filter Box Mounting Clips 36 Flex Conduit 1 Straight Conduit Fitting 1 Elbow Conduit Fitting Ash Pan Shaker Handle Owner s Manual Warranty Registration Filter Box Kit Flex Conduit Fittings Junction Box Blower Mount SF3500 only Shaker Handle Ash Pan Thermostat Fan Control High Limit Relay 3 Speed Fan Switch Blower Brackets Automatic Draft Control Blower...

Страница 5: ...he plenum Locate the furnace as close to the chimney as possible while still maintaining the above clearances No more than 8 feet of stovepipe should be used including two or less 90 elbows All horizontal runs of pipe should have a minimum 1 4 in rise per foot All stove pipe must be 24 gauge or thicker When re installing the heat exchanger inspect the gasket around the furnace opening and replace ...

Страница 6: ...nit from it s box Loosen the four bolts in the pipe on the front of the furnace Insert the nose of the oil gun into the pipe Before sliding the oil burner all the way in apply the gasket around the nose of the oil gun by wrapping it around the nose Next slide the oil burner into the pipe and secure it by tightening the four bolts around the col lar Be sure to tighten the bolts evenly to locate the...

Страница 7: ...fore the filter box All hardware brackets etc for the blower will be found in the car ton with the blower Next position the blower in the filter box centered behind the inlet hole and allow approximately 1 8 in space between the rear of the furnace and the blower outlet Now install the filter rail onto the filter box NOTE The filter rail is best installed on the side toward the shaker handle so th...

Страница 8: ...limit switch is packaged with a jumper between the two sets of terminals inside REMOVE THE JUMPER WIRE INSIDE THE FAN CONTROL The fan control should be installed in the right side of the ple num and 12 to 18 inches above the top of the furnace A separate conduit should be run from the fan control to the junction box Mount the thermostat in a central location of the area you want to heat Run two wi...

Страница 9: ... SF3500 Wiring Diagram SF3500 Wiring Diagram ...

Страница 10: ...10 SF2600 Wiring Diagram SF2600 Wiring Diagram ...

Страница 11: ...the high limit adjustment Pre set at 200 degrees it s function is to close the automatic draft control flapper door if the temperature in the plenum reaches 200 degrees Do not change this setting The center pointer adjusts the temperature at which the blower starts A good initial setting for this is 150 degrees The pointer on the left is to adjust the temperature at which the blower stops A good i...

Страница 12: ... method as before always closing the bottom door before open ing the top door Now load the firebox with wood to the desired fullness All Harman furnaces may be loaded with wood as full as possible for high output and long burn time Then close the door and allow all the wood to catch fire The bottom door may again be opened to speed the process The object is to get the wood burning well enough so i...

Страница 13: ... door Whenever the bottom door is open it should be closed before opening the loading door This is to increase draft through the loading door and prevent excess smoke from escaping The firebox should never be filled with excessive coal so that the flue exit is blocked or impeded in any way Burn ing coal generates carbon monoxide If the flue gas exit is blocked the carbon monoxide can be forced out...

Страница 14: ...nly Remove oil burner by removing four mounting bolts Burner can be tied up to ceiling to avoid having to remove the wiring Next remove the collar from the front cover and remove front cover by tilting out from top first Now the heat exchanger will be exposed Next remove the four nuts that hold on the cover then remove the cover This will ex pose the inside of the heat exchanger Remove spirals by ...

Страница 15: ...ebox Dimensions Inches 16Wx22Lx20 5H 18Wx26Lx21 5H 18Wx26Lx21 5H 18Wx30Lx25H Recommended Log Length 18 in 22 in 22 in 27 in Maximum Log Length 22 in 26 in 26 in 30 in Flue Size 6 in 7 in 7 in 7 in Filter Size 14 X 20 14 X 20 14 X 20 14 X 20 Number of Grates 4 5 5 6 Weight 580 Lbs 700 Lbs 900 Lbs 800 Lbs Plenum Dimensions 20 X 20 20 X 20 20 X 25 20 X 25 Clearance to Combustibles Rear 30 in 30 in 30...

Страница 16: ...ssary to allow for proper thermo siphon action The method by which hot water will circulate automatically through the system A Shut off the water heater and the water supply to it Drain the tank completely B Remove the Temp Presure relief valve and discard Install a short 3 4 in nipple and tee 1 along with a new relief valve C run 3 4 in copper tubing between the water tank and the top leg of the ...

Страница 17: ...tely B Remove the Temp Presure relief valve and discard Install a short 3 4 in nipple and tee 1 along with a new relief valve C Remove the drain valve at the bottom of the tank Install a short 3 4 in nipple and tee and re install the drain valve to the tee 4 D Install a circulating pump as shown 6 Run 3 4 copper tubing from the circulating pump to the lower leg of the water coil This is where the ...

Страница 18: ... C No 1 to 1 Draft Inches of water column 06 to 08 Tests for CO must be made without a fire in the wood coal firebox and with all doors and draft controls completely closed The burner should be fired for several minutes prior to taking a reading Normal CO reading is 11 to 12 with a stack temperature of 300 degrees or less This would give you an efficiency of 84 to 85 percent ...

Страница 19: ...manufacturer giving the model and serial numbers the date of purchase your dealer s name and address plus a simple explanation of the nature of the defect SHIPPING COSTS The transportation charges are as follows 1 Customer prepays freight back to factory 2 Harman Stove Company prepays the repaired or replaced stove freight charges NOTE Prior approval by phone or in writing shall be made before shi...