20
Min. above ground level
18"
Fig. 32
minimum flue vent configuration
It is required that outside air
be installed with this venting
configuration to reduce smoke and
creosote smell in the room in the
event of power failure.
Through the ceiling vent, follow PL vent manufacturers
recommendations when using wall and ceiling pass
through.
Note: Do not place joints within wall pass-
throughs.
PL vent manufacturer's
firestop spacer and
support
No insulation or
other combustible
materials are allowed
within 3" of the PL
vent pipe.
Storm collar
Flashing
3" min.
3" min.
3" min.
12" min.
(See Page 10 for
corner installation
clearances)
Fig. 31
venting
Fig. 33
36"
36" min clearance to any
combustible material
12" min. wall to outlet
Shaded area represents
the minimum clearance to
combustible materials such as
shrubbery, mulch or tall grasses.
#8 Installing through the ceiling vent
Содержание Accentra
Страница 2: ......
Страница 41: ...41 Service Maintenance Log Date Of Service Performed By Description Of Service ...
Страница 42: ...42 Service Maintenance Log Date Of Service Performed By Description Of Service ...
Страница 43: ......