Inspection Procedure
CMC CLUTCH™ by Harken Industrial™
6
5.
Pull rope through the device as if using it to haul. Check that the Sheave turns and emits an audible
clicking sound.
Disposition
Use the criteria outlined in the inspection checklist to properly disposition the device. If one or more inspection points
are marked as Monitor, then the device should be dispositioned as Monitor. If one or more inspection points are marked
as Fail, then the device should be dispositioned as Fail.
Disposition States:
Pass – Continue to use, next required periodic check in 12 months.
Monitor – Use with caution, next required periodic check in <12 months (document date on Periodic PPE Inspection
Form).
Fail – Do not use, render device useless before disposal to prevent further use.
CMC Rescue, Inc.
6740 Cortona Drive
Goleta, CA 93117, USA
805-562-9120 / 800-235-5741
cmcpro.com
ISO 9001 Certified
©2019 CMC Rescue, In. All rights reserved.
CMC and
are registered marks of CMC Rescue, Inc.
Control No. PPE - 335011.00.10232019
1
2
3
4
5