
12
Step 13
Locate: 2 x Grid Tracks (13), 1 x Water Bowel.
Tools Needed: None
Procedure: Install one grid track (13) in each of the
next holes up from the bottom hole, located in the
grid support for both the left and right hand sides
of the cabinet.
The water bowel is then slid into the grid tracks
to be supported above the wood chip box and lid.
Step 14
Locate: 8 x Grid tracks (13) and 4 x cooking racks
(14)
Tools Needed: None
Procedure:
— Install the remaining grid tracks (13) in the
grid support holes on each side of the cabinet.
Make sure that they are on the same level
hole on each side so that the cooking rack sits
straight.
— Slide a cooking rack(14) into each pair of the
grid tracks to secure the cooking racks at the
desired position.
— Install the woodchip box and water bowl as
shown.
Step 15
Locate: Zip Tie [7d]
Tools needed: None.
Procedure:
— Loop the Zip Tie [7d] through the outside
hole of the front smoker leg [6] as shown.
— Capture the gas hose with the zip tie to
secure it. Do not pull the zip tie too tight - it may
restrict gas flow through the hose.
CAUTION
The wood chip box must be inserted over
the burner during operation. This is to
protect the burner from falling particles,
grease drippings and accidental spill over
from the water bowel.