HARDY MANUFACTURING CO., INC (MODEL KBP270) PAGE 27
8-2 Weekly Maintenance
In addition to your daily maintenance there are a few steps that need to be completed
weekly.
1. Shut off fuel supply to furnace, flip the System Control Switch to the Off Position,
and allow the system to burn remaining fuel in Firebox Burn Chamber. Do not
continue with maintenance until furnace has completely burned all fuel and has
cooled down.
2. Open the front door, using the ash removal tool and ash pan provided, you will
need to remove any accumulated ash from the top outer surfaces of each Heat/
Particulate Recovery chamber in the heater. Work from the top chamber down.
3. Repeat above procedure for the middle, and lower chambers.
4. Remove ash build up from the front and interior surfaces of the Firebox Burn
Chamber.
Do not attempt to clean the Firebox Burn chamber while the unit is
running.
5. Open the front door. Visually check the stir shaft to make sure that all the air
fingers are open with no restrictions. If restrictions are present you will need to
remove the stir shaft and clean the Stir fingers and orifices (refer to Stir Shaft
Installation and Removal in section 9-4).
Warning: the heater will have to be shut down and cooled before
completing this procedure.
6. Follow steps in Stir Shaft maintenance instructions in Section 9-4. While the stir
shaft is removed from the heater, remove any accumulation of ash in the Firebox
Burn Chamber. Reinstall the Stir Shaft according to Stir Shaft Installation and
removal instructions in Section 9-4. Failure to maintain the stir shaft will result in
improper burning in the Firebox Burn Chamber.
Содержание KBP270
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK ...