Electrical installation of the charging pole

DANGER!

Danger to life due to electric shock!

Before working on the cPP2 charging pole: Disconnect the power supply 

and ensure that it remains permanently disconnected during work.

After completion of the mechanical installation, the charging pole is connected to the 

power supply. Only the standard connection of the power supply line is described below: 

The installation and connection of optional accessory components is not the subject of 

these instructions, but is described in the instructions for the respective component.

NOTE!

The internal circuits are protected as standard by RCBO type A C32 10.03 
(Residual current operated Circuit-Breaker with Overcurrent protection) 
already installed per charging point.
In addition, the 

supply line

 must be limited to a 

maximum current of 63 A

 

by an on-site 

back-up fuse

.

Deviating country-specific standards (connection conditions) must be observed!

NOTE!

Please note that the charging pole may only be connected with 

ONE

 supply 

cable with a maximum conductor cross-section of 50 mm² (max. 35 mm² with 
wire end sleeve).

For the electrical assembly you need the following components:

Slotted screwdriver, min. blade width 6 mm (not included)

Stripping pliers for supply cable (not included)

  NOTE!

The initial start-up of the charging station 

MUST ALWAYS

 be performed 

by a qualified installer: The installer will be able to verify the correct 

operation of the charging station or correct any malfunctions or 

installation errors.

Installation and operating manual 

cPP2

 charging pole

Version: 1.0.2

                                                                                                                           21

Содержание cPP2

Страница 1: ...The smart charging pole cPP2 Installation and operating manual Installation and operating manual cPP2 charging pole Version 1 0 2 English...

Страница 2: ...eCharge Hardy Barth GmbH Leinbergstra e 14 92262 Birgland Schwend Phone 49 0 9666 188 00 50 Fax 49 0 9666 188 00 31 Web www echarge de Mail support echarge de Installation and operating manual cPP2 c...

Страница 3: ...al drawings and dimensions 14 charging pole 14 Pedestal 15 Foundation 16 Assembly and installation 17 Requirements for the assembly site 17 Socket installation 18 Electrical installation of the chargi...

Страница 4: ...ated symbols carry the following meanings Danger Life threatening electrical voltages occur Actions marked with this symbol MUST NEVER be performed Caution Sections marked with this symbol indicate ad...

Страница 5: ...by non compliance of the assembly and manual instructions by usage of non authorized replacement parts or accessories or by deploying non qualified professional staff This charging station corresponds...

Страница 6: ...ording to IP 44 However it should not be installed in the immediate vicinity of flowing or jet water The cPP2 charging pole must not be installed in an explosive environment EX area The cPP2 charging...

Страница 7: ...arked at the prescribed distance from the charging station for charging operation and can be connected to the charging cable without tension Make sure that the front door of the charging pole is alway...

Страница 8: ...ion and the optionally available charging cables at regular intervals for any damage If the optionally available charging cables show any damage please have them replaced immediately Further charging...

Страница 9: ...variant in question the cPP2 is always designed for the fastest possible charging of the connected electric vehicles in terms of circuit design cable diameter and connections Thanks to access control...

Страница 10: ...rrent detection which in combination with the installation s protective devices ensures careful protection against short circuits electric shocks and other hazards Access to the internal switchgear is...

Страница 11: ...outside and inside of the housing CAUTION The charging station may only be opened by qualified personnel The model designation cPP2 xTyy and the values for the mains connection voltage mains frequenc...

Страница 12: ...ring of the internal electronics Testing report 1 Test report of the test launch at the factory RFID cards 5 eCharge Hardy Barth Mifare RFID cards Available accessories optional eCharge Hardy Barth Gm...

Страница 13: ...ly available concrete foundation using four supplied screws L x W x H 369 x 173 x 40 mm weight ca 2 5 kg 3M40430 Charging cable IEC Type 2 for connection to all charging stations and vehicles with cha...

Страница 14: ...tested All dimensions as well as the mounting points are shown in the following dimensional drawings charging pole Front and side view of the cPP2 series incl pedestal all dimensions in mm pedestal no...

Страница 15: ...em number Application area 200 mm 3M40431 For mounting on a foundation sunk into the ground 100 mm 3M40434 For mounting on a foundation that is flush with the ground 40 mm 3M40430 Top and side view of...

Страница 16: ...ion 3M40420 The foundation contains a pipeline that ensures the protection of the supply line The concrete of our foundation meets the strength class C 30 37 and exposure classes XC4 XF1 and WF Techni...

Страница 17: ...t you can easily reach the charging socket on the vehicle with the optionally available charging cable of the cPP2 The cable must NEVER be under tension when connected to the vehicle Requirements for...

Страница 18: ...igh volume of people or on thoroughfares In particular ensure that the charging cables are laid in a clearly visible position and that passers by or walkways are NOT obstructed by the cables In princi...

Страница 19: ...trical connection can be made without any problems 3 Now mount the pedestal e g 40 mm on top of the concrete foundation and screw it tight with the enclosed M12 screws For the prescribed strength clas...

Страница 20: ...pedestal 200 mm 3M40431 on top of the concrete foundation and screw it tight with the enclosed M12 screws For the prescribed strength class 8 8 the tightening torque should be about 90 Nm 4 Then clos...

Страница 21: ...Breaker with Overcurrent protection already installed per charging point In addition the supply line must be limited to a maximum current of 63 A by an on site back up fuse Deviating country specific...

Страница 22: ...ding terminal labelling supply line terminals Incorrect connection of the cores can lead to damage to the charging station 4 Screw clamps properly Description Wire colour Marking terminal block Live c...

Страница 23: ...ON 7 Close the cover of the column and lock it with the swivel handle ATTENTION For operation it is recommended that you install cylinder locks in the swivel handle of the charging pole to prevent una...

Страница 24: ...arging couplings housing and charging sockets For charging your cPP2 has different connection options from the TYPE 2 plug depending on the variant Accordingly you need an optionally available chargin...

Страница 25: ...y as possible However the effective charging time depends on the vehicle battery as well as the current residual energy in the vehicle A binding statement on the charging time is therefore not possibl...

Страница 26: ...ard in front of the charging station s card reader for approx 3 seconds A short signal tone will sound to indicate that the card has been successfully recognised Immediately afterwards another tone wi...

Страница 27: ...ly with a separate house connection measurement Local overload protection In combination with a compatible inverter or additional eCB1 MP the charging station also allows 100 use of the solar power of...

Страница 28: ...arging outlets one after the other If you have connected a charging cable and want to unlock it you must hold a valid RFID card against the module Should you wish to log on to several charging sockets...

Страница 29: ...splay purposes the LEDs can be light up permanently on flashing 1Hz not light up permanently off In normal operation the following colours and states are displayed Status LED Description Green Chargin...

Страница 30: ...switch them on again via the toggle lever if necessary Error of the internal 12V DC power supply unit Check internal 12V operating voltage or contact support if necessary Vehicle is not detected LED...

Страница 31: ...vervoltage protection Type 1 Type 2 combined Energy meter MID compliant per charging point Authentication RFID Mifare DESFire ISO14443A B and LEGIC Prime Advant Charge release Free charging local RFID...

Страница 32: ...1 1 Mode 3 Charging with specific charging plug in systems for electric vehicles with pilot and control contact IEC 61851 21 2 Requirements for on board chargers for electric vehicles with alternating...

Страница 33: ...his includes claims that are due to the following causes 1 deterioration due to normal wear and tear corrosion damage accident faulty storage or operation lack of reasonable and necessary maintenance...

Страница 34: ...anufacturer in cooperation with the local distributor will attempt to restore the proper function of the product Any costs incurred for the transport of the product shall be borne by the customer If t...

Страница 35: ...______ ____________________________________________________________ ____________________________________________________________ ____________________________________________________________ __________...

Отзывы: