The following installation instructions apply to the concrete foundation (3M40420) with
the 200 mm stainless steel pedestal (3M40431):
1.
Once you have found an installation site that meets
the requirements (see page 17), the first step is to dig a
hole of size 0.8 to 0.96 m x 0.45 m x 0.36 m (H x L x W).
Make sure that the supply line must be fed either
from the right or from the left and that it meets
the pipeline provided in the foundation. Align the
foundation so that it is level (horizontal).
2.
Lower the concrete foundation into the hole and guide the supply cable upwards
through the guide embedded in the concrete foundation. Make sure that the cables
protrude far enough so that an electrical connection can be made without any
problems.
3.
Now mount the stainless steel pedestal 200 mm
(3M40431) on top of the concrete foundation and screw
it tight with the enclosed M12 screws. For the prescribed
strength class 8.8, the tightening torque should be about
90 Nm.
4.
Then close the gaps next to the concrete foundation (e.g.
with soil). Make sure that the pedestal remains level
(horizontal).
5.
Now place the cPP2 charging station on the stainless
steel pedestal. To do this, open the housing panel of the
charging pole via the swivel handle on the left side of the
cPP2. Place the charging pole in position above the
mounted pedestal. Insert the supply cables via the cable
opening in the base of the charging pole. Place the
charging pole on the pedestal so that the through holes
in the base plate of the charging pole are directly above
the threads in the pedestal. Screw the charging pole into
the pedestal with the four M8 x 20 hexagonal bolts supplied using the open-end
wrench.