8
HARDI
®
FOAM MARKER STANDARD VERSION
Control Box
Compressor
Box
+12V
-12V
Fuse
3.1 Control Box Installation
1. Select desired location for control box.
2. Route wire harness from compressor box up to the double lead of
the power supply cable and plug into the male plug (
Fig. 4
).
(Extension harnesses are available.)
3. Route wire harness from Control Box down to the double lead of the
power supply cable and plug into the female plug.
Note: Make sure that the wire harness will not interfere with any
operations of the tractor or sprayer.
4. Route power cable to power supply (Section 3.2).
FOAM MARKER SCHEMATIC
Fig. 4
3.0 INITIAL SETUP
Содержание FOAM MARKER Standard
Страница 34: ...34 HARDI FOAM MARKER STANDARD VERSION 14 0 NOTES ...
Страница 35: ...35 HARDI FOAM MARKER STANDARD VERSION NOTES ...
Страница 36: ...36 HARDI FOAM MARKER STANDARD VERSION NOTES ...