6 - Maintenance
36
Vertical Alignment of Middle and Outer Sections
Steps for adjustment:
1.
Start with the middle section, which is aligned with the inner
section.
2.
At the top of the boom, nuts (A, B) are adjusted. Wrench = 41 mm.
Raise the boom: Loosen (A), tighten (B).
Lower the boom: Loosen (B), tighten (A).
3.
At the bottom of the boom, the ram eye (C) can be adjusted if
needed. Remove the black pin (D), loosen the jam nut (E) and turn
the ram eye 180°. Replace the black pin and check alignment of the
boom section.
4.
When the middle section is aligned, tighten all jam nuts.
Adjustment is completed when the alignment is straight, and the
folding is trouble-free.
5.
The outer section is aligned with the middle section in the same
way by completing steps 2 & 4.
Содержание Delta Force Boom
Страница 1: ...The Sprayer Operator s Manual DELTA FORCE BOOM Instruction book 67025103 Version 1 00 US 05 2017 ...
Страница 2: ......
Страница 4: ......
Страница 8: ...1 Welcome 6 ...
Страница 12: ...2 Safety notes 10 ...
Страница 18: ...3 Description 16 ...
Страница 20: ...4 Sprayer setup 18 ...
Страница 24: ...5 Operation 22 ...
Страница 47: ...45 Diagrams Boom Hydraulics 2 Fold Boom Mechanical Yaw 8 Technical specifications ...
Страница 48: ...8 Technical specifications 46 Hydraulic Yaw ...
Страница 49: ...8 Technical specifications 47 Mechanical Yaw with Norac ...
Страница 50: ...8 Technical specifications 48 Hydraulic Yaw with Norac p ...
Страница 51: ...8 Technical specifications 49 Boom Hydraulics 3 Fold Boom Hydraulic Yaw ...
Страница 52: ...8 Technical specifications 50 Hydraulic Yaw with Norac ...
Страница 55: ......