8
INITIAL INSTALLATION
6. Remove liner from back of clamp (DD). Place
clamps (DD) alongside the path of the power cord
and insert power cord into clamps (DD), making
sure the cord does not hang in the way of the fan.
6
Hardware Used
Clamp
x 6
DD
5. Clip downrod (A) to secured eye
bolt
. Check the
length of the power cord from the outlet to the fan
(do NOT plug in the fan). Using the zip tie (EE)
secure power cord slack to the side of the
downrod.
5
Hardware Used
Zip Tie
x 1
EE
EE
4.
4
Secure an eye
bolt
(not included) to ceiling of
building structure.
*
NOTE:
It is very important you use the proper
hardware when installing the eye
bolt
as this will
support the fan.
DD
DD
A