- 25 -
D. Check Points after 1month Operation
A) Is there change of pressure?
B) Is there leakage of oil ?
C) Isn't there smooth bolt and screw? (Check U-BOLT)
D) Isn't there smooth from connecting parts such as hydraulic pressure hose, pipe?
E) Is there move the locking installations properly?
F) Is there move the control valves properly?
G) Isn't there broken parts of wire cable?
H) Is there crack or damage of the structure?
I) Is hydraulic pressure oil in the oil tank sufficient?
J) Isn't there generation of suspicious noise during operation?
E. Check Points after 6months Operation
A) Disinfect the outer surface of the Hydraulic pressure cranes.
B) Is there change of pressure?
C) Is there leakage of oil ?
D) Isn't there smooth bolt and screw? (Check U-BOLT)
E) Isn't there smooth from connecting parts such as hydraulic pressure hose, pipe?
F) Is there move the locking installations properly?
G) Is there move the control valves properly?
H) Isn't there broken parts of wire cable?
I) Is there crack or damage of the structure?
J) Is hydraulic pressure oil in the oil tank sufficient?
K) Isn't there generation of suspicious noise during operation?
L) Is the pump and hydraulic pressure parts in proper connection?
M) Please exchange the filter.
N) Is the condition of the hydraulic pressure oil good?
Please replace the color of hydraulic pressure oil if the color change to black
or white.
O) Please check the infusion state of lubrication then put oil.
Содержание HS Series
Страница 1: ...Instruction Manual Repairing Guide MODEL HS2750 SMART HANSIN SPECIAL EQUIPMENT CO ...
Страница 6: ... 5 Diagram of Equipment Composition ...
Страница 9: ... 8 Diagram of Equipment Appearance ...
Страница 10: ... 9 Working Radius Diagram ...
Страница 11: ... 10 Hyd Component Circuit ...
Страница 12: ... 11 Connective Diagram of Electricity ...
Страница 13: ... 12 리모콘 송신기 메인 밸브 Connective Diagram of Electricity ...