- 23 -
C) Handling procedure
- 3-
WAY V / V switch in the direction of the boom .
- Operate the boom slowly to desired position.
6) Handling method of the emergency equipment
- If the vehicle engine cannot use, the emergency equipment will be used for
rescue in department boarding.
- Press ON the emergency switch as well as remote control lever .
7) AML operation
- If the outrigger is not maintain on the ground firmly, you cannot operate the
main boom after switching the 3-WAY valve.
- After the operation, if do not entirely move the boom rest down you cannot
do outrigger operation after switching the 3-WAY valve.
- Be able to operate if within the safety scope limit, you cannot operate if out
of the safety scope limit as AML moves.
- Allowable weight limit (300 kg) for bench, over the limit the all operation will
stop.
Содержание HS Series
Страница 1: ...Instruction Manual Repairing Guide MODEL HS2750 SMART HANSIN SPECIAL EQUIPMENT CO ...
Страница 6: ... 5 Diagram of Equipment Composition ...
Страница 9: ... 8 Diagram of Equipment Appearance ...
Страница 10: ... 9 Working Radius Diagram ...
Страница 11: ... 10 Hyd Component Circuit ...
Страница 12: ... 11 Connective Diagram of Electricity ...
Страница 13: ... 12 리모콘 송신기 메인 밸브 Connective Diagram of Electricity ...