Installation
Maximum time between installation and commissioning
Procedure
1. Make sure that the time between installation and commissioning is not more than 1
month. If this is not possible, speak to H.I.T.
Remove the packaging material
Procedure
1. Move the package to a dry area that has a good airflow.
2. Do a check for these items:
• Damage to the package.
• Damage to the protection of machined surfaces and shaft extensions. For the
specification of the protection, refer to section
Corrosion protection by H.I.T.
page 52.
3. If you see damage, tell H.I.T. immediately.
4. Remove the packaging material from the gear unit.
5. Do a check if the gear unit agrees with the shipping papers.
6. If the gear unit shows damage or does not agree with your order, tell H.I.T.
immediately.
Installation instructions for parts that are not part of the gear
unit
Procedure
1. For installation instructions of parts that are not included in this document: refer to
the drive package documentation.
2. For installation of electrical components: refer to section
11.
Do a check for corrosion of internal parts of the gear unit
Procedure
1. Open the inspection cover. For the location of the inspection cover, refer to the
certified drawing.
2. Do a check for corrosion of internal parts of the gear unit.
3. If there is a sign of corrosion of internal parts of the gear unit, do these steps:
a) Make a report.
b) Give the report to H.I.T.
Install the couplings
8
8.1
8.2
8.3
8.4
8.5
Installation
28