4
English
Assembly
(see page 31)
Safety Notes
Gloves should be worn during installation to prevent
crushing and cutting injuries.
The hot and cold supplies must be of equal
pressures.
Installation Instructions
• Prior to installation, inspect the product for transport
damages. After it has been installed, no transport or
surface damage will be honoured.
• The pipes and the fixture must be installed, flushed
and tested as per the applicable standards.
• The plumbing codes applicable in the respective
countries must be observed.
• The fittings must be mounted in an insulated manner
and with sound insulation.
Assembly
(see page 31)
• Install body with Rp 3/4 outlet pointing downwards.
• Depth of fitting: 68 mm to 96 mm.
• extension set 28 mm
Note: When installation is complete ensure
that the mixer is turned off!
A
Direct wall installation.
B
Direct wall installation with 10 mm adjustable
mounting studs.
C
Brick wall installation.
Technical Data
This mixer series-produced with EcoSmart
®
(flow limiter)
Operating pressure:
max. 1 MPa
Recommended operating pressure:
0,1 - 0,5 MPa
Test pressure:
1,6 MPa
(1 MPa = 10 bar = 147 PSI)
Hot water temperature:
max. 70°C
Recommended hot water temp.:
65°C
Connections Rp 1/2:
cold right - hot left
The product is exclusively designed for drinking water!
Symbol description
Do not use silicone containing acetic acid!
Adjustment
(see page 32)
To adjust the hot water limiter. Using a hot water limiter
in combination with a continuous flow water heater is
not recommended.
Dimensions
(see page 33)
Flow diagram
(see page 33)
Tub outlet
Shower outlet
Spare parts
(see page 34)
Special accessories
(order as an
extra)
• extension set 28 mm #32498000
(see page 34)
Final assembly
(see page 35)
Содержание 31741180
Страница 31: ...31 A B C...
Страница 33: ...15 0 89 12 3 80 Rp1 2 90 17 30 5 55 60 Rp3 4 R p 1 2 33...
Страница 36: ...36...
Страница 37: ...37...
Страница 38: ...38...
Страница 39: ...39...